Posted on

heater for medical waste

heater for medical waste.Controlled air clinical waste incinerator produced for incineration of bio-medical waste generated at a blood-processing center. The waste to be handled mainly includes bio-waste (i.e. bodily fluids), transmittable and likewise polluted items such as syringes, needles, in addition to other clinical waste (i.e. silicon rubbers, plastic, fabrics, papers, packs, and so on). A diesel terminated clinical waste heater having an ability of 300Kg/hr. To be set up at a waste disposal site from booming places.

Demands

Posted on

burner suppliers

Mmedical waste burner with the capacity of getting rid of as much as 0.25 cubic meter of pathological or infectious waste.

incinerator providers.7) Burn price: 15 – – – – 20 Kg/h 8) Ability: hardly any less than 130 L.
13) Any sort of type of instrument or dedicated gadget known as to the suitable performance and additionally use of the tools included.Incinerator clinical waste diesel, building and construction in painted steel light weight aluminum resistant to heats up, device control

indication flame, reload indicator, temperature level control gadget, dropping ability of 250kg/ 10 individuals resources in 2 phases

Posted on

hospital incinerator distributor

CSH Wellness Facility, (Calabar, Nigeria)

Mmedical waste burner capable of obtaining rid of roughly 0.5 cubic meter of pathological or infectious waste.

Burner to have double burning room as well as control quantity of dioxin as well as various other gasses discharged without being damaging.

Approximated measurements, to distributors common, nevertheless to be portable as practical.
– – Pneumatically-driven or hydraulic ram payment method.
– – Upright cost door on key chamber.
Minimum installation along with launch time.
Sturdy Hand Protection Pairs: For Waste handling staff-06 Pairs.
Size (mm): 1280 or far better.
Established to shed disposables that can along with need to be destroyed on-site. Theses wastes include additionally polluted as well as transmittable “red bag. ” Surgical dressings, plastic evaluation devices as well as additionally other wastes.
Plastic Bags: 2000 no’s each in Red and likewise Yellow shade.

Set Up Power (Electric Voltage): 440V/ 50 Hz.
Filter: ceramic or Numerous various other equivalent filters to be able to reduce the induction of hazardous air impurities, particulates, carbon monoxide, dioxin/furane into the ambience.
Billing system:.
Capacity (Cubic Mtr): 1.65 M3 or more.
– – Car closed down of the door after charging.
Size (mm): 1880 or better.
Temperature level Tracking: Both for essential as well as also additional chambers.
Waste Tracking Tools should have;.{
(adsbygoogle = window.adsbygoogle || []).push({});|}
– – Primary as well as second chamber temperature provided as well as likewise taped (optional).
Premium top quality warm immune, 2 layers modern epoxy Paint coating.
Max, Operating Temperature: 1350 level centigrade.
Waste damages efficiency: > > 90% by weight.
Min. Running temperature: 90 level centigrade.
Aluminized steel coating lined with refractory as well as likewise firebrick. Displays recorders along with various other accessory devices should certainly be provided.
Dual chamber burning, Chambers shielded along with lined with heat refractory. Programmable digital temperature level controllers, temperature level indicators as well as likewise charge recorder. Regulating control for gas and also air lowers gas consumption.
Mobile packaging cart: 06 No’s– – For transport of gym waste from wards to heater site/ place, Opening up from the top.
Gas:- Gas.
Residency time in Second Chamber: 2 sec.
Quick, complete, reliable waste disposal.
(adsbygoogle = window.adsbygoogle || []).push({});

CSH Health And Wellness Facility, (Calabar, Nigeria)

Mmedical waste heater capable of obtaining rid of roughly 0.5 cubic meter of pathological or transmittable waste.

|Established to shed disposables that can along with need to be destroyed on-site. Theses wastes include additionally polluted as well as transmittable “red bag. ” Surgical dressings, plastic evaluation devices as well as additionally other wastes.
– – Upright cost door on key chamber.
Set Up Power (Electric Voltage): 440V/ 50 Hz.

Posted on

About Us

Nanjing Clover Medical Technology Co.,Ltd. local in Nanjing city, China which is near to Shanghai port.

We are Waste Incinerator Manufacturer in China. We produce medical waste incinerators, pet animal cremation equipment and othe solid waste incinerators. The burning rate from 10kgs,20kgs,30kgs,50kgs,100kgs,150kgs,200kgs,300kgs,500kgs,600kgs per hour, the daily treatment capacity up to 6ton per day.

Clover Incinerators made all double combustion chamber, Italy original oil or gas burners. We use stainless steel chimney for our incinerator with long lifetime. For clean emission, we supply dry or wet scrubber with advantage technology.

Incinerator market and customers are all over the world and have local dealer supply direct service.

Nanjing Clover Medical Technology Co., Ltd.  is a leading waste incinerator manufacturer in China. All series included burning capacity 10kgs per hour, 30kgs per hour,50kgs per hour,100kgs per hour,150kgs per hour,300kgs per hour,500kgs per hour. Up to now, all models sale to all over the world and have good feedback from end-customer. The YD Model medical incinerator have multi-combustion chamber and basic dry scrubber (smoke filter chamber) with reasonable project budget. For the cleaner emission require, we accept custom made wet scrubber for incinerator and this will be also our next working by focusing on emission technical.

Regular model incinerator for market with burning rate from 10kgs to 500kgs per hour and we always proposal customer send us their require details, like waste material, local site fuel and power supply, incinerator operation time, etc, so we can proposal right model or custom made with different structure or dimensions.

Incinerator Model YD-100 is a middle scale incineration machine for many different usage: for a middle hospital sickbed below 500 units, for all small or big size family pets (like Alaskan Malamute Dog), for community Municipal Solid Waste Incineration, etc. The primary combustion chamber volume is 1200Liters (1.2m3) and use diesel oil or natural gas fuel burner original from Italy.

All our incinerator use stainless steel chimney, not steel.All our incinerator have two combustion chamber at least, not single chamber. All fuel burner from Italy made with famous brand, best quality.

300kgs per hour burning rate incinerator is well liked by market because this model can be medical waste incineration equipment for big hospital and also very good for other solid waste treatment with lowest cost, even if big size animals also can be feed into the combustion chamber. The primary combustion chamber volume is 2.4m3, big enough for common size animals. For shipping transport, YD-300 can be loaded into 40’feet full high container.

Big size combustion chamber up to 4.0m3 and Internal Dimensions is 257 x 147 x 108cm with feeding door opening 108 x 128cm. This model can be a small waste incineration factory with little amount of budget funds. If end customer use this for farm to burn animals like cow, horse or camel, contact with us now.

Contact with us by email or phone now!

Email: [email protected]
Phone: +86-25-84610201

 

 

 

 

 

 

 

 

 

Posted on

Project Case

Iincinerator Map

Waste Incinerator International Market Analytics

Date.

 

Key Word:

little incinerators

medical waste incinerator

pet animal cremation incinerator

incinerator manufacturers

 

 

Incinerator is a incineration equipment, direct fire waste by gasoline fuel or oi gas. As different circumscription, incinerator can be named many words as below:

 

Therapy capacity: small scale incinerator, large scale incinerator and incineration pant.

Waste material: Municipal waste incinerator, medical waste incinerator, animal cremation incinerator, human cremators

Incinerator gas: gas incinerator, oil incinerator

Waste to Energy (WTE): WTE incinerator, non-WTE incinerator

Incinerator Manufacturer: China incinerator manufacturer, UK incinerator manufacturer, USA incinerator manufacturer, India incinerator manufacturer.

Famous Incinerator manufacturer company: Inciner8(UK), Clover Incinerator(China), Pennram (USA), Haat (India)

Burning Rate: 5kgs/hour, 10 kgs/hour, 15 kgs/hour, 20 kgs/hour, 30 kgs/hour, 50 kgs/hour, 100 kgs/hour, 150 kgs/hour, 300 kgs/hour, 500 kgs/hour

 

Pyrolytic incineration technical is traditional waste treatment way for several years. All over the world, in many countries, people anti incinerator since the incinerator will create a large Dioxin in the smoke. “Dioxins” refers to a group of toxic chemical compounds that share certain chemical structures and biological characteristics.  Dioxins can be released to the environment through forest fires, backyard burning of trash, certain industrial activities, and residue from previous commercial burning of waste.  Dioxins break down very slowly and previous releases of dioxins from the natural and man-made resources still exist in the environment. Anyhow, we have to remind this, that is big scale incineration pant, generally greater than 30 ton per day. This is a societal problem, to analyze and suggest ways in different angles from the general public, government, economic growth, environmental protection, technology development, etc..

 

So, why we still use incinerator? Pyrolytic technology can kill the virus, pollution control.

Second, for human body, pet animal, in many countries and regions, we want to cremation them. This is the service in the practice of society development, and ceremonies to commemorate the disappearance of existence.

 

As above two reason but not only above, we still use incinerators.

 

How you can discover reasonable incinerator for your local site?

Incinerator is not a cheap equipment, generally the small scale version’s price around $5,000usd per unit and large scale version’s price more than $50,000usd per unit. Thus, before purchase one unit incinerator, you need to make clear following things:

A, burn what? Incinerator is a incineration equipment, function is fire waste. So what kind of waste you want to treatment?

B, large or small? This according to the waste output every day or the waste quantity per feed time, like animal size. Incinerator use gas or oil fuel, generally, gas fuel is cheaper than oil and the smoke cleaner than oil fuel model. But some local site don’t have gas distribution system.

And other technology items, like power(220v, 380v), waste feed door kind, incinerator structure, etc..

 

After you clarify these, you can go to discover a local or worldwide producers, asking prices, technical specifications and ultimately purchasing the ideal products.

Wrote by Nicky

 

List of Incinerator Customers

 

Asia:

East Timor

Papua New Guinea

Indonesia

Kazakhstan

Viet Nam

Georgia

United Arab Emirates

Iraq

Africa:

Somalia

Mauritius

MoroccoI

Tanzania

Rwanda

Zambia

Oceania:

Australia

Europe:

Belgium

Moldova

North America:

United States

 

 

 

 

 

 

 

Posted on

FAQs

Q: what is kind of waste can utilize in this equipment?

A: This gear for medical waste, pet animal, Municipal waste, reside waste. Prohibit any volatile and radiation material, liquid waste and gas waste.

 

Q: Treatment capacity

A: Typical Capacity calculated by medical waste(lower calorific power (L.C.P): 3.0TH Kcal/Kg per hour), not indicate any waste material. The animal/pet combustion speed around 2/3 of average power.

 

Clover incinerator use time per day up to 24 hours. Between each feed/combustion time, there are approximately 0.5-1 hours cooling time and time for feeding waste. Actual combustion time per day is about 16 hours. The lifetime of incinerator between 5-10 year according to use.

 

Generally, we proposition small lab, small clinic use capacity under 20 kgs per hour. When incinerator use in hospital, please calculate the waste output capacity around 2kgs per people each day. If there are 200 sickbed at the hospital, that’s mean you need one incinerator capacity around 400kgs each day, change to power per hour is around 30-40 kgs per hour. According the operation time per day, waste material, budget, development, etc, you can use capacity from 30-50 kgs per hour incinerator.

*How to calculate Animal Cremation Burn Rate: 2/3 of the medical waste.

 

Q: Assembly and Testing

A: We provide all documents and incinerators easy to setup and operation. Client can send people come to our factory to learn operation and installation. Generally, We do not send engineer to local site if not request. The dispatch cost is extra according to order.

 

Q: Combustion Temperature

A: The first combustion chamber: 800-1000 centi level.

The second combustion chamber: 1000-1200 centi level. PLC mode according to model and order.

 

Annual around $500-$1000usd annually maintenance according model, use situation.

 

One individual can service 02 device incinerators. The team should have basic electrician knowledge to operate/inspect/maintaince incinerator/burner/blower according to performance user guider, and understand risk of medical waste to protect worker self with necessary security element.

 

Q: The Residency period in secondary combustion chamber

A: 02 sec.

 

 

 

 

 

 

 

Q: The Residency time in secondary combustion chamber

A: 02 sec.

 

 

 

 

 

 

Posted on

Contact Us

Nanjing Clover Medical Technology Co., Ltd.

Tel: +86-25-8461 0201

Fax: +86-25-8461 0406

Website: www.inciner8.cn

Email:  [email protected]

Service Skype: clover-incinerator

Pусский: www.hiclover.ru

中文: www.haiwo.net 

Photo Gallery: www.eclover.net 

Clover News: www.incinerator.info

Facebook: www.facebook.com/hiclover 

Twitter: twitter.com/hiclovercom  

YouTube: youtube.com/c/IncineratorClover


contact hiclover

Send Message by below contact form:

Contact Form

Posted on

china lab waste incinerators

.Necessary tooling and gauges shall have to be provided.

 

14. Supplier shall have to arrange free training for consumer staff in operation and maintenance

 

15. Supplier shall have to supply related drawings/diagrams (civil, mechanical and electrical etc.)electrical load and

electrical circuitry

 

16. Warranty period shall be 24 months from date of proving test.

We’re in the process of constructing a new hospital waste treatment plant and we’re assessing different technologies

from around the world.  We’re wanting to incinerate approx. 1 to 2 tons of bio-medical waste per day using LPG for

heating.  Please send me all general advice and quotes for machines of all ranges which could meet our needs.

Additionally, please include emissions reports of all of the various machines that may be of interest to us particularly with

regards to  dioxins and furals as well as lists of recommendations from past customers.

destruction capacity: 3.000 kcal/kg diesel.

max consume: 2.5 gal per hour.

1 camera:

1 burner capacity: 80.00 kcal

Sort: K (Ni-CrNi)

enter size: 500x500mm

ash door: 190 x 250mm

all kind of health, hospital, veterinary and industrial wastes by Incineration Process.

We ’re interested with your Incinerator plants, and we want to get quotation and key features description of

distinct capabilities of your Incinerator plants, concerning: small versions (5 — 25 kg/hr); medium versions (25-50 kg/hr)

and big versions (50-100 kg/hr) and plus.

 

2 camera:

1 burner capacity: 80.000 kcal.

Air conbustion: 0.5 HP

Sort: K (Ni-CrNi)

 

 

 

  • Total waste produced per day: 10-12 tonnes;

 

  • Hours of Operation: 10 hours a day;

 

  • Fuel requirement: Diesel or waste oil preferred but LP gas will be considered;
Posted on

Pet cremation incinerator price

Intermittent Feed (w/optional loader): .9 yd3/hr (.7 m3/hr) up to 8 hrs/day

 

 

 

 

Specifications: Length overall -9′-6″ (2896 mm) batch system w/o loader

 

 

 

 

18′-6″ (5639mm) w/optional loader system Width overall -7′-6″ (2820mm)

 

 

 

 

Height (w/o stack) -10′-0″ (3048mm) Approx. Weight – 14,000 pounds.

 

Note:

All pollutant concentrations must be expressed at Oo C and 1.013 x 10 5 N/m2, dry gas and 11% oxygen correction.

 

Oxygen correction is calculated as:

 

Es =      21 — Os    x EM

  1. The average dioxin and furan concentration in the emissions should not exceed 80ng/m3 total dioxins and furans

21 – OM

 

Where:   Es   = Calculated emission concentration at the typical percentage oxygen concentration

EM = Measured emission concentration

Os   = Standard oxygen concentration

OM = measured oxygen concentration

 

10   Operation     1.    Materials destined for incineration should be of known origin and composition and has to

be just incinerated in a furnace that’s registered for the particular sort of waste.

 

error should be recorded in a log book and reported to the appropriate authority.

 

authority.

 

11   Housekeeping     The site where the incinerator is built must:

 

 

 

  1. A record must be kept of the quantity, type and origin of the waste to be incinerated.
  2. The incinerator must be preheated to working temperature before charging any waste.
  3. The incinerator must not be overcharged.
  4. The incinerator must be in good working order at all times and must not be used if any component fails. Any

12   Health & Safety (Protective Gear) 1.    Staff handling waste has to be well trained on safe handling of

hazardous wastes

  1. The incinerator operator and all relevant staff must be trained to the satisfaction of the relevant control

goggles.

 

 

 

  1. Have running water.
  2. Have a solid floor.
  3. Have lighting if 24hrs operation
  4. Have fly ash containerization and storage before disposal.

 

 

12   Health & Safety (Protective Gear) 1.    Staff handling waste must be well trained on safe handling of

hazardous wastes

  1. Staff must be provided with appropriate protective gear such as, gas mask, aprons, gumboots, helmets, gloves,

goggles.

 

  1. Caution and Warning signs must be provided.
  2. Fire fighting equipment must be provided
  3. There should be no smoking or eating on the site.

 

Posted on

BURNER DIESEL FIRED

Maintenance control recommendation.
2.3 Ash.
Additional components and also consumables recommended by the Distributor.
▪ The key combustion chamber is the significant framework of the.
certification.
▪ The system provided will be established to run normally under
▪ The maintenance agreement cost includes work, transport and also.
A cover;
▪ To supply diesel services storage tank (Capability 400 litres).
Upkeep, solution and also dealing with centre, which can be recognized by.
fittings.{
(adsbygoogle = window.adsbygoogle || []).push({});|}
▪ The Potential buyer will be liable to provide as well as additionally set up all.
the professional.
The Manufacturer, as well as which has the capability to swiftly provide genuine.
Is supplied throughout the one year alternative guarantee duration. In.
· Heater: set up on/off procedure.
Specifications with a capacity to thaw 100kgs/Hr.
▪ The smokeshaft will be painted with accepted warmth immune.
ͦ Providing the name along with speech of its qualified.
Procedure handbook 2 ranges.
Paperwork so as to assist with the authorized demands for the
2.13 Diesel Storage tank.
ͦ Verifying that this recognized maintenance, service and also.{
(adsbygoogle = window.adsbygoogle || []).push({});|}
· Optimum rating: a minimum of 450kW/hour.
Well as on info displays along with on print-outs will surely remain in
Shedding chamber for removal of bit pollutants.
I. Waste kind Healthcare waste.
Republic of Kenya. The Bidder will supply a time .
The waste will be reduced by 90 ~ 95% to leave 10 -5% ash.
▪ The container have to be connected to the burner at higher degree.
▪ Limiting constant service constraint 1000 ° C.
It needs to be made to keep the exhaust gases, for a minimum of two
▪ It is prepared for that the Potential purchaser cooperates really carefully with the.
2.7 Warm face merchandise.
2.9 Smokeshaft/ Lot.
2.11 Afterburner.
ii. Waste thickness 125 to 350Kg/M3.
Minimal elevation of 10 meters above ground level.
▪ High capacity second combustion chamber with house time.
▪ Representatives of the Obtaining Authority and also the
Repair work centre has the capability to swiftly provide authentic added components along with.
▪ Horizontal strong hearth, refractory lined vital burning.
Power Supply, Environment, Temperature Degree, Wetness, and so on
▪ The Potential customer needs to supply a warranty for one year.
2 Devices.
Of the Bidder to provide a complete system, consisting of all eventually
Waste Keeping Track Of Standard 2006, authorized notice No. 121 of
heater, made from light steel plate and also tensed with.
Jacks and also establishing heater.
6 Selecting along with Training.
The total structure as well as creating duration. The delivery.
Make available all required technical information, attracting, etc to.
Entrained in the flue gas flow.
▪ Setup Monitoring and also Sychronisation Act, 1999.
Configuration jobs.
2.10 Ignition Burners.
devices.
Service/maintenance guidebook 2 ranges.
▪ Prior to the expiry of the service warranty / signing off, the distributor shall.
A burning chamber with fireplace with a filter to preserve ashes;
. One Guidebook Lots Burner making up:.
▪ Handbook Loading door (sturdy steel door with suitable.
To buttocks medical waste in a neat along with eco effective
Secs to make sure that the apparatus ’s dependable damage of the combustion
▪ 1 off diesel-fired ignition heater– – temperature managed.
Calcium silicate insulation).
▪ The primary burning chamber need to guarantee minimum separation.
The entire system will definitely be taken into consideration. It will be the duty
▪ 1 off melting air supply follower and also blood flow system, automated.
▪ The capability of the burner called for must be into the
▪ The Rep will examine prepared operating specifications

▪ The representative will carry out a two days operation & & & & maintenance. Training into the Biomedical engineering staff members along with heater.
Clinical center and also the Obtaining Authority. The treatment plant must.
Needed for the issuance of provisionary approval.
vi. Little capability 100Kg/hour established loads.
Operators after configuration & & & & appointing of the devices.
▪ The Potential buyer supervises of consents as well as also blessings for
▪ Thickness 25mm.
▪ Need to be manufactured from refractory lined light steel or high.
▪ The Potential buyer will provide as well as also mount the incinerator with the.
Delivery to website along with completion of confirmation procedures
29th September 2006 as well as specifically third schedule legislation
To supply ideal control of the operating problems and
including degree indication.
Consists of gadgets. ▪ The burner ought to be a modern-day garbage disposal system, made
Fulfillment of this need with their offer, potential buyers must.
Burner: set up on/off operation.

Fragment collection agency ought to be incorporated after 2nd.
▪ Should be refractory lined into the adhering to requirement; Hearth in addition to.
Average intake: at minimum 4.5 litres/hour.
Branches to help in the workout.
Adhering to connected specifications

For the Supply, configuration & & & & appointing of a Professional Waste Burner as comprehensive listed here.
▪ Provide elevating gears like forklift, gantry, rollers, and also training.
English language.
Procedure for establishing as well as running incinerators.
The plant moved by sea will not be provided as “deck.
( 26, 47) connecting classification, criteria, standards, along with
Top-notch stainless steel. The chimney/stack needs to have a.
importation. The Potential buyer will offer all the vital
5 Capability to service devices.
A wind generator allowing supply air.
Obligation brickwork or high durability castable.
▪ Refractory lined flanged smokeshaft should more than the elevation of.
And additionally setup time need to be agreed between prospective buyers, goal.
· Regular consumption: at least 3 litres/hour.
Fully packaged oil kind, total with electrical ignition along with flame failure modulates wired with consistent running enthusiast and also total with shutoffs, fan as well as also electrical motor.
Maximum ranking: at the very least 450kW/hour.
iv. Dampness internet material 10-25%.
Execute the controls, testing and also initial authorization for provisional
▪ The burner will be operated a three-phase power source
vii. 2nd chamber 2 minutes @ 1100 ° C. viii. Environmental Administration Coordination Act, 1999 and also specifically, Waste checking criteria, 2006.
Temperature degree isn’t less than 850 ° C
2.12 Flue gas treatment.
Occur at the last site.
The states of the purchaser ’s nation. The conditions include
Installation as well as likewise putting into use the tools.

▪ Duration of Implementation is 90 days from agreement trademark for
items.
· Optimum use: a minimum of 6 litres/hour.
Considerable steel help frame. Internally the covering is lined with.
Send a statement authorized by the producer or agent.
▪ Anticipated day-to-day operating duration 8 hrs.
fashion. It needs to use a temperature based justification control system
▪ Control panel– – automated operation.
▪ Maximum running period 12 individuals resources.
The connecting pipe has to be a black pipeline of scale.
The Possible customer shall make certain that all parts of.
Lodging for the engaging in service technicians.

▪ Temperature level indication primary as well as additionally additional chambers 0.
containing:
As well as size. Consist of various other going along with gadgets and.
2.6 Chamber.
▪ Give training equipment to lift, place up as well as similarly position smokeshaft, along with.
▪ Thermal conductivity 1.3 W/mk.
A mechanical.
Recipient, along with the Prospective client ’s representative, will
Reduced area of chamber walls.
Not much less than 2 secs @ >> 1100 ° C. ▪ 1 off diesel-fired afterburner– – temperature level handled.
Upkeep, solution in addition to fix centre,.
control.
▪ 3 stage 415 V a.c., 50/60 Hz.
Recall: The second burning chamber need to be sure that the gas temperature as established versus the inside wall surface in the second chamber & & & & not at the flame location, isn’t much less than 1100 ° C. 2.2 Throughput.
▪ All the burners to be provided as well as established fulfill the
offer sustains slings as essential. Enable cutting of tree.