Posted on

Resilient and very efficient burners with different capacities for hospital/medical waste, cremation and also various other strong waste therapies

MOC

Single and additionally Double Chamber Medical Incinerator.durable and exceptionally reliable burners with various capacities for hospital/medical waste, cremation as well as various other powerful waste therapies.

Chamber Double

Burning Rate 10 kg per hour (for 2 incinerators)

Burning Rate 20 kg per hr (for three burners)

Packing Method Guidebook

No of Burners Single for 10 kg/hour and Double for 20 kg per hr

Fuel Diesel and also Natural Gas

Warm Up Time Not greater than 20 minutes

Temperature controller Digital

Power Supply Single Stage 220V

Smokeshaft Elevation 20 feet from floor level

· 50kg per hr

· Choice for clinical waste.

Kind
Chrome Alloy Steel, inside lining with fire bricks/Ceramic Clay

Outer Lining
125 Kg/hr

Design Standards
Cylindrical

Dimension
1000 Kg/Day

Burning Capacity
Port Opening as well as Ladder for exhaust testing with total online rubbing system, thermostat

The systems will be used for our customer camps in the area. These Camps vary in manning size from 20– 200 individuals. Each site has a medical facility, a very little usage for clinical yet will take it.

Accessories
Thermal Proof Lining

STACK

Type
1.25 m Dia (Approximate) x 1.2 m Elevation (Approx)

Temperature Level
Normally validating to IS Standards

Kind of melting procedure
Documents, Containers wastes

Capability
400– 600 ° C

MOC

MOC
MS

Accessories
Port Opening as well as Ladder for exhaust testing with total online rubbing system, thermostat

The systems will be used for our customer camps in the field. These Camps vary in manning size from 20– 200 individuals. Each website has a medical center, a really little usage for clinical yet will require it.

Posted on

Various Sorts Of Incinerators

Whole lot 5– Mobile Burner.
Added chimney expansion, show height.
Weight (kg), please indicate:.
1000 Litre Gas Tank + Pipeline System, indicate volume.
Guarantee, reveal no of years

Great deal 7– High Temperature Waste Mobile Incinerator.
Warranty, reveal no of years

Burner version C.
Gas Retention Time – – 2 Seconds. Power Supply for – Control Box – 220V-240V 50Hz solitary stage. 1 year Spare Components Bundle for complete maintainability. 10m Hose pipe Pipe, show length.
I000 Litre Gas Tank + Pipeline System, reveal amount.
Minimum operating temperature 920 ° C, please indicate.
Additional chimney growth, indicate altitude.
HTW Mobile Incinerator layout G.
Minimum leave speed of the discharges not less than 10 metres/second
Home time in the second chamber not much less than 2 seconds
1 year Spare Components Package for complete maintainability.
Burn Price 65kg/h minimum.
Weight (kg), please indicate:.
Distinct and/or noticeable alarm to caution the driver when the additional temperature drops to below the required temperature
Burn Price 250kg/h minimum.
Additional Chamber.
Burn Rate 100kg/h minimum.
Control box which can be detached and placed on separate stand at least 1.5 meters from incinerator at approximately 1.6 meter height

Burner version A.
Burn Price 150kg/h minimum.
Gas Retention Period 2 Seconds.
Second Chamber.
Fuel Diesel/LPG/LNG, please reveal.
10m Hose Pipe, indicate size.
Gas Retention Time – – 2 Seconds. Power Supply for Control Box- 220V-240V 50Hz solitary stage.
1 year Spare Parts Package for complete maintainability.
Weight (kg), please indicate:.
Minimum operating temperature 1200 ° C, please indicate.
Mobile Incinerator model E.
Additional combustion
Weight (kg), please indicate:.
Additional chimney expansion, suggest elevation

Burner layout B.
I000 Litre Gas Tank + Pipe System, indicate volume.
Gas Retention Time – – 2 Seconds. Gas – Diesel/LPG/LNG, please indicate.
General
Diesel/LPG/LNG burning main combustion chamber/primary burning area
Power Supply for Control Box 220V-240V, single stage 50-60Hz.
Minimum operating temperature 1200 ° C, please reveal.
Added chimney expansion, indicate elevation.
Weight (kg), please reveal.
Additional chimney expansion, indicate altitude.
Burn Price – – 150kg/hour minimum.
Minimum running temperature 920 ° C, please reveal.
Second Chamber.
Burn Rate 50kg/h minimum.
Secondary Chamber.
1000 Litre Gas Storage Tank + Pipe System, show volume.
Burn Rate 100kg/h minimum.
Second Chamber.
Gas Retention Period 2 Seconds.
1000 Litre Fuel Tank + Pipeline System, indicate amount.
Service warranty, indicate no of years

Whole lot 4– High Temperature Waste Incinerator.
Smokeshaft with a minimum elevation of 4 meters above ground level
Gas Retention Time – – 2 Seconds. Fuel – Diesel/LPG/LNG, please indicate. Power Supply for – Control Box – 220V-240V 50Hz single stage. Minimum operating temperature 850 ° C, please indicate. 1 year Spare Components Bundle for complete maintainability.

hazardous waste high temperature incinerators for the treatment of contaminateds materials. The waste will certainly be blended, including medical, oily wastes, forests as well as lab wastes. Key combustion

Great deal 7– High Temperature Waste Mobile Incinerator.
HTW Mobile Incinerator design G.
Burn Rate 100kg/h minimum.
Weight (kg), please indicate:.
Second Chamber.
Gas Retention Time – – 2 Seconds. Gas – Diesel/LPG/LNG, please indicate.
Power Supply for Control Box – – 220V-240V 50Hz single phase.
Minimum operating temperature 1200 ° C, please show.
One year Spare Parts Plan for complete maintainability.
10m Hose Pipe, indicate size.
1000 Litre Gas Storage Tank + Pipeline System, show quantity.
Additional chimney extension, suggest elevation

Posted on

Medical waste incineration system

Medical waste incineration system of 300 kg/hr shed price with dual fuel (gas as well as diesel) Form, daily 8-16 hrs Process and a Heap elevation of 15 meter.Primary burning

* A button breaker for every engine (ventilators in addition to burners).
* A regulator with electronic viewing for the temperature of combustion.
* A sheath of all the gases charred.
15.
The gas temperature as measured versus the inside wall in the second room, not in the flame zone, Won’t be as indicated in Lots 1-7;
5. ” PYROLYTIC” burning, by regulating the gasification of waste.
2. It must have the ability to operate less than 10 hours/day
23. Exhaust Requirements Conformity: BS 3316 or équivalent requirement.
10. The lower calorific power (L.C.P) of this waste will certainly be 3,500 kcal/kg
19. A control box making certain the full cycle of burning. Fan:.
– Character: Calcium silicate.
* A second shot of air to ensure best oxygen net content.
4.
The minimum departure rate of the exhausts won’t be less than 10 metres/second; 1. Capability of destruction in weight: 60 Kg/h.
* A gadget of air inlet of cooling of waste gases,.
* A regulatory authority with watch for the temperature level of postcombustion.
– Refractory concrete:.
– Shield in coarse panels:
* A burner of lights that the use is limited to the ignition of waste.
* Electro-ventilator dispersing the secondary air, the principle of the air flow being carried out by valves and also adhering to the control of the automatic cycle.
12. The loudness of the combustion chamber: 1.200 L.
i. The primary combustion chamber will be accepted as the key burning zone;
11. The Interior diameter of this Smokeshaft: Ø 400 and its height: 8 m.
* The insulation of the combustion chamber have to be composed of refractory blocks, having a high web content of aluminium and insulates bricks in order to guarantee a minimum temperature on the outside sheet steel.
7. It must be able to reduce the number of wastes by 98%.
The smokeshaft shall have a minimum elevation of 4 meters over ground level;
* Carcass in solid sheet steel with assistance of link.
. Nature: 42% of Al203.
13.
The home time in the next room shall not be less than 2 secs;
* Heater of lights of waste, with fuel, common mono-bloc casting directing stirring fire, lights and also safety and security of electronic ignition, long-term air flow, electromagnetic sluice entry of regulation and also separating valve.
24. The supplier will perforn an onsite setup of this burner.
* Burner with fuel, mono-bloc dispersing leading kind with straight flame, illumination and safety and security of electronic ignition, irreversible ventilation, electro-magnetic sluice gateway of regulation and separating shutoff.
22. Refine Filtering system: Scruber to be mentionned as discretionary.
22. The supplier should provide sets of spare pieces of very first urgency and consumable of the incinerator.
6. The burner has to stay clear of the release of black smoke in addition to good dust, (Electric) during the loadings.
16. The seller has to provide necessary details for the top of this setup.
8. It must be able to hold emission in the 2nd melt with gasoline home of not less than 2 seconds.

21. The de- ashing must be carried out in all-time low of the burning chamber or the deashing ought to be Automatic or hands on batch p ashing.
– The Temperature levels of burning: Minimum will certainly be 850oC in Addition to max 1400oC
* Composition of the refractory;.

. Thickness: ≥ 75 mm.
* A timer with flexible temporization for the law of each burner.
25. The technical training of operators will need to be provided as well as provided by a professional.
Both the primary and the additional temperature levels shall be preserved till all the waste has actually been completely combusted;

Smokeshaft
23. Capability to deal with Plastic: Not less than 40 percent by weight.
9. The incineration ought to be totally devoid of noticeable smoke as well as offensive odours.
23. The set up incinerator should birth a 1 year guarantee.
* Frontage of packaging with door seals gone up on hinges, wheel of screw plug, flexible joint, and packaging protecting out of refractory.
24. CE Manufacturing Compliance: BS EN 746-2-1997.
14. Heater procedure must be Automatic On/Off.
21. Controls and guidelines:.
– Shield in fibrous panel:.
.
Nature: 65 percent of Al203.
3. This burner has to be able to ruin all combustible wastes produced by health care facilities, private clinics, research labs, institutes, and so on.
17. A burning chamber of waste:.
* A heater of combustion of gases.
* Plate of combustion in Carborundum, preventing the repairing of glass and slags. A chamber of post combustion of gases.
* Completely limited door for the hand-operated loading of waste. The loading ought to be Guidebook, Batch Tons.
ii. The minimum burning of the main room Won’t be less than 800 degrees C;

Second combustion

21. The de- ashing must be performed in all-time low of the burning chamber or the deashing ought to be Automatic or hands-on batch de ashing.
22. Refine Filtering system: Scruber to be mentionned as optional.
23. Exhaust Requirements Conformity: BS 3316 or équivalent requirement.
23. Capability to deal with Plastic: Not much less than 40% by weight.
24. CE Manufacturing Compliance: BS EN 746-2-1997.
22. The provider should provide sets of spare parts of very first urgency and consumable of the incinerator.
23. The set up incinerator should birth a one year guarantee.
24. The provider will perforn an onsite setup of the burner.
25. The technological training of operators will have to be provided as well as provided by a professional.
from the factory; it will consist of alleviative and preventative upkeep, as well as using device, etc

Posted on

INCINERATEUR COMBUSTION DAMAGE OF MEDICAL WASTE PYROLYTIC As Well As LAB

Use diesel, construction in repainted steel resistant aluminum at heats, fire gadget controller indicator, charging indicator, temperature control device, melting ability of 250 kg/ hr in two phases (primary and second electronic camera).
12.
2. Do the components ship totally constructed or in things?
1.
3. SUITABLE FOR WASTE CATEGORIES A, B, C, D As Well As E MEDICAL WASTE BY UNEP As Well As THAT.
As well as resistente to high temperatures, device indicator for fire.
16. BOX CONTROL AND REGULATION.Diesel clinical waste burner made of steel repainted in aluminum.

Posted on

burner for medical waste

burner for medical waste.Controlled air clinical waste incinerator made for incineration of bio-medical waste produced at a blood-processing center. The waste to be dealt with mainly includes bio-waste (i.e. physical liquids), infectious and also contaminated materials like syringes, needles, and other clinical waste (i.e. silicon rubbers, plastic, textiles, documents, packs, and so forth ). A diesel fired clinical waste burner with a capability of 300Kg/hr. To be set up in a waste disposal site away from populated places.

Requirements
Oil Container ability of Burner – – 300 Lit Oil pump capacity – – 0.4 Kw (400 g ). Clinical waste Incinerators for melting healthcare facility waste so we are trying to find a resource

Posted on

burner providers

incinerator Providers.7) Burn Cost: 15 – – 20 Kg/h

Mmedical waste burner capable of disposing as much as 0.25 cubic meter of transmittable or pathological waste.

signal flame, reload sign, temperature controller gadget, shedding capacity of 250kg/ 10 hrs in two phases

Posted on

hospital incinerator supplier

Total / Paint:-.
Waste Management Tools must have;.

Burner to possess dual burning chamber and also control amount of dioxin as well as other gasses released without being hazardous.

Estimated dimensions, to manufacturers typical, but to be compact as possible. Capability: roughly 60kg daily, voltage: 220V and also gas fired.

CSH Health Center, (Calabar, Nigeria)

Mmedical waste burner capable of getting rid of approximately 0.5 cubic meter of transmittable or pathological waste.

Incinerator to possess dual burning chamber as well as control amount of dioxin and other gasses discharged without being harmful.

Approximated dimensions, to suppliers standard, however to be compact as possible. Ability: approximately 120kg daily, voltage: 220V and diesel fired.INCINERATOR (WASTE INCINERATOR).
Gas:- Gas.
– Approximately 100kgs per hr of waste or red bag waste rated at 2200 BTU’s per kg.
Long Shoes Pairs: For waste handling– 06 Pairs.

Posted on

INCINERATOR DIESEL FIRED

Upkeep control proposition.
Specs with a capability to melt 100kgs/Hr.
Best quality air-cooled stainless steel. The chimney/stack must have a.
▪ Connect heaters to fuel supply.
To bum medical waste in a clean in addition to environmentally effective
cargo”.
accreditation.
The total construction and constructing period. The delivery.
5 Ability to support tools.
the specialist.
2.11 Afterburner.
6 Appointing as well as Training.
Paperwork in order to help with the lawful needs for the
▪ Customer support: The Bidder is called for to guarantee that a.
To make it possible for free-flow of diesel from the storage tank to the incinerator.
Medical centre and also the Getting Authority. The therapy plant must.
Waste Tracking Guideline 2006, lawful notice No. 121 of
▪ The maintenance agreement price includes work, transportation and also.
A cover;
The plant transferred by sea shall not be delivered as “deck.
Republic of Kenya. The Bidder will supply a time .
iii.
Make accessible all needed technological advice, drawing, etc to.
iv.
Calcium silicate insulation and also a hot face mixture of very.
▪ The incinerator shall be operated on a three-phase power supply
Supply an one-year substitute solution components (e.g. oil filters, air.
importation. The Prospective buyer shall offer each of the essential
Setup works.
I. Waste type medical care waste.
Take place at the last destination.
Procedure manual 2 sets.

Operators after installation & & commissioning of the devices.
▪ The container should be attached to the incinerator at higher level.
Reduced section of chamber walls.
▪ Calcium silicate.
▪ The smokeshaft will be painted with accepted warmth immune.
· Optimum evaluation: a minimum of 450kW/hour.
▪ Thermal conductivity 1.3 W/mk.
▪ Restricting constant solution restriction 1500 ° C. ▪ Thickness 100mm.
Any sort of roof adjacent to the incinerator.
▪ 1 off diesel-fired ignition burner– temperature controlled.
ͦ Verifying this accredited care, service as well as.
Burning chamber for removal of particle pollutants.
▪ 3 stage 415 V a.c., 50/60 Hz.
▪ Provide lifting gears as forklift, gantry, rollers, and lifting.
Additional components and consumables recommended by the Supplier.
The linking pipe has to be a black pipe of accepted estimate.
Subsequent connected specs

For the Supply, installation & & appointing of a Clinical Waste Burner as comprehensive listed below:.
2.10 Ignition Burners.
chamber. Approximate measurements 800 mm diameters x 2100mm.
▪ The primary burning chamber need to guarantee minimum departure.
2.3 Ash.
▪ The Potential buyer is in charge of all authorizations and approvals for
Fulfillment of the need with their offer, prospective buyers need to.
Temperature level isn’t less than 850 ° C
And also setup time have to be agreed between bidders, target.
▪ For the technological examination, not simply the treatment plant
ͦ Supplying the name as well as address of its licensed.
▪ Needs to have particulate cleaner (scrubbers). A mechanical.
fashion. It should use a temperature based reasoning control system
2.14 Electrical Supply.
long.
2.7 Warm face material.
Maximum rating: 450kW/hour.
The Producer, and which has the capacity to rapidly offer genuine.
products.
4 Certification.
▪ Agents of the Getting Authority and also the
Fully packaged oil kind, total with electric ignition and also flame failure controls, wired with constant running fan and also total with all shutoffs, fan and also electric motor.
▪ Refractory lined flanged chimney should be over the height of.
· Maximum use: a minimum of 6 litres/hour.
▪ Give lifting equipment to hoist, erect and place smokeshaft, as well as.
consisting of:
Calcium silicate insulation).
· Regular consumption: at least 3 litres/hour.
Includes all devices.
▪ Prior to the expiry of the service warranty/ signing off, the supplier shall.
Branches to assist in the workout.
Of the manufacturer:.
▪ Temperature level indicator main as well as secondary chambers 0-.
Offer supports slings as necessary. Enable cutting of tree.
29th September 2006 as well as especially third timetable law
Substantial steel help frame. Internally the covering is lined with.
▪ All the burners to be supplied and set up meet the
Additionally necessary additional systems and additional
2.12 Flue gas treatment.
▪ The Prospective buyer must provide a guarantee for one year.
▪ It is anticipated that the Prospective buyer cooperates very closely with the.
Maintenance, service as well as fixing centre, which is accredited by.
Lodging for the attending service technicians.

▪ The representative shall perform a two days functioning & & maintenance
And also final approval. The provisional and final approval shall
vi. Small ability 100Kg/hour put tons.
▪ National Atmosphere Monitoring Authority (NEMA).
▪ The system supplied will be developed to operate usually under
Well as on information displays in addition to on print-outs will stay in
· Heater: scheduled on/off operation.
▪ Density 25mm.
▪ The key combustion chamber is the important structure of the.
refractory lining).
Burner electrically operated
required for the issuance of provisional approval.
Is offered throughout the 1 year service warranty period. In.
▪ Maximum working duration 12 hrs.
Consisting of level indicator.
Recipient, together with the Prospective buyer’s rep, shall
Remember: The secondary burning chamber should be certain the gas temperature as determined versus the within wall surface at the second chamber & & not in the fire area, is less than 1100 ° C. 2.2 Throughput.
Service provider for the brand new waste handling structure/ real estate and also will.
Installment and also putting into use the equipment.

▪ Duration of Execution is 90 days from contract signature for
▪ The Prospective buyer shall supply and install the incinerator with the.
Seconds to make sure the unit’s dependable destruction of the combustion
A wind turbine allowing air.
Optimum use: 9 litres/hour.
2.9 Smokeshaft/ Heap.
2 Tools.
Include a high capacity thermal oxidizing additional chamber.
Execute the controls, screening and first authorization for provisional
ii.
. Training to the Biomedical engineering employees in addition to burner.
Burner: scheduled on/off operation.

Posted on

BURNER For incineration of Laboratory wastes products

Incinerators to be suitable for the expert disposal of scientific & & medical waste/ rubbish with a greater lots capacity in the series of approximately 1000-1500 Kg. The sturdy, self-contained incinerators will supply an efficient and extremely efficient, safe disposal as well as to be made according to relevant global instructions, e.g. CE, EU, etc. Type of Gas: Diesel or Petrol or Natural Gas. Temperature controlled,
effective burner for optimum gas economy. Burner at the best innovation and an approximate capacity of 2000 bunch/ year. Maybe an incineration ability of 200 kg/ human resources in addition to a calorific worth of 7500 kcal/ kg. Industrial and also domestical waste.INCINERATOR For incineration of Lab wastes materials

Functions
i.Smoke and odor free
ii.High Temperature, refractory mobile lining with excellent warmth retention
iii.Quick warm up time
iv.Must have Another room v.Constant run follower
vi.Temperature monitoring vii.Thermostat Control

Technical Specifications
i.Capacity: approx. 0.20 m3
ii.Fuel intake: 5 litres/ hour Diesel Oil
iii.Min Operating Temp: 900 oC
iv.Max Operating Temp: 1350 oC
v.Residence Time: 2 sec
vi.Burning speed: 35kg/hr minimum

Accessories
Typical accessories needed

Consumables and also Spares
Provided with spares as well as consumables to achieve a minimum of 1000 examinations