Posted on

Medical Waste Incinerator

Basic Info.

Model NO.:medical waste incinerators china
Export Markets:Global

Product Description

A Model animal crematory burning rate from 20-400kgs a hour. Heavy duty combustion room and match for big animal cremation.  Residency time 2.0 sec. In place combustion chamber. Virtually smoke and smell free. 

Smoke Filter Chamber with filter brick, Virtually smoke and smell free after burningoff.

Italy original oil or gas burner, quality reliable. It suit for petrol oil, natural gas, LPG gas. 

User guider, full setup and operation document for customer.

Items/Model A1500 A2400 A4000 A5500
Burning Rate *animal 90 kgs/Hr. 150 kgs/Hr. 200 kgs/Hr. 400 kgs/Hr.
Feed Capacity *animal 120 kgs 200 kgs 300 kgs 500 kgs
Equipment Weight 7000 kgs 8300 kgs 13000 kgs 16500 kgs
Picture  
Primary Chamber (Liters) 1500 2400 4000 5500
Secondary Chamber (Liters) 500 1200 1500 1500
External Dimensions (cm) 240x170x380 260x220x420 320x220x460 360 x 220 x 475
Internal Dimensions (cm) 150x100x96 220x110x100 257x147x108 300 x 147 x 125
Oil Tank(Liters) 500 500 500 500
Door Opening (cm) 59 x 81 90 x 110 108 x 128 108 x 128
Chimney (M) 10 10 14 14
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Secondary Chamber  YES YES YES YES
Mix-Combustion Chamber YES YES YES YES
Smoke Filter Chamber YES YES YES YES
Combustion Fuel Oil/Gas Oil/Gas Oil/Gas Oil/Gas
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Temperature Monitoring YES YES YES YES
Posted on

Мусоросжигательная установка для больничных отходов

описание продукта

Компания Nanjing Clover Medical Technology Co., Ltd. является ведущим производителем мусоросжигательных установок в Китае. Мы – местный производитель и один из крупнейших экспортеров Китая. Техническое оборудование пиролитических инсинераторов – это основная обработка отходов во всем мире, включая медицинские отходы, сжигание животных, кремацию домашних животных и другие твердые отходы. Емкость от 10кг / час. До 500 кг / час, до 6 тонн в день. В настоящее время мы поставляем различные серии в соответствии с требованиями местных клиентов и проектируем обновленную мусоросжигательную печь с использованием наших передовых технологий. Обновленные конструктивные особенности нашего ассортимента мусоросжигательных печей делают их одними из самых экономичных в мире.

Инсинератор с ПЛК модели TS – это новейшая разработка для обработки отходов, включая медицинские отходы, кремацию животных и другие твердые отходы. Это качественное оборудование для различных объектов, таких как больница, небольшие поставщики мусоросжигательных установок, небольшие установки для сжигания отходовc, небольшие установки для сжигания отходов, небольшие установки для сжигания медицинских отходов, сделанные нами, небольшие установки для сжигания медицинских отходов, отдел охраны окружающей среды, агентства по кремации животных и т. Д. Поставка мусоросжигательных установок CLOVER обновленные модели с двойной камерой сгорания и камерой дымового фильтра с огнеупорными линиями, а также температурой камеры сгорания до 1200 ° C.

Предметы / Модель TS50 (ПЛК)
Картина
Скорость сжигания 50 кг / час
Емкость подачи 100кг
Режим управления ПЛК
Камера сгорания 560 л
Внутренние размеры 100x80x70 см
Вторичная камера 280L
Камера дымового фильтра да
Режим подачи Руководство по эксплуатации
Напряжение 220В
Мощность 0,7 кВт
Расход масла (кг / час) 12.1–24
Расход газа (м3 / час) 9,9–26,1
Монитор температуры да
Температурная защита да
Масляный бак 100л
Дверца подачи 70×55см
Камин 5 метров
Тип дымохода Нержавеющая сталь
1-й. Температура камеры 800 градусов – 1000 градусов
2-й. Температура камеры 1000 градусов-1200 градусов
Время проживания 2.0 сек.
Вес брутто 4500кг
Внешние размеры 230x130x155 см
Posted on

Dead Pet Cremation Equipment

Product Description

Nanjing Clover Medical Technology Co., Ltd. Is a leading waste incinerator manufacturer in China. We are local manufacturer and one of the largest exporter of China. Pyrolytic incinerator equipment technical is main waste treatment all of the world, for Medical waste, Pet animal cremation and other Solid waste. The capacity from 10kgs/Hr. To 500kgs/Hr., up to 6ton per day. Presently, we supply different series for bunker capacity, incinerator. Au, incinerator(smokeles), incinerator+hospital, incinerator+manufacturer, incinerator modelsyc10 2b, local customer requirements and design updated incinerator with our leading technology. The updated design feature of our range of incinerators make them one of the most cost effective in the world. 

Key Features: 
* All models with Dual combustion chamber. 
* Stainless Steel chimney/stack, long lifetime. *according to order 
* High temperature, long lifetime of incinerator. 
* Free or minimum installation on site. 
* High burn rate, from 10kgs to 500kgs per hour, up to 6ton per day. 
* PLC Control Plane. *according to order 
* New Design for pet animal cremation business. 
* One year warranty on incinerator and parts in stock.

Items Specification
YDC Model YD-10C / YD-20C / YD-30C / YD-50C
Main Product List Primary Combustion Chamber
Secondary Combustion Chamber
Mix Combustion Chamber
Smoke Filter Chamber
Incinerator Common Control Case
Stainless Steel Chimney
Italy oil/gas burner: 02 units
Oil Tank (if oil fuel)

Posted on

Incinerador a diésel 150 kg / h

INCINERADOR, DIESEL.

CAPACIDAD: Quemador 150 kg / hr.

Cantidad: Dos [2] con accesorios completos.

Tipos de residuos que se utilizan: RESIDUOS GENERALES

Las máquinas estarán certificadas para su funcionamiento por PME después de pasar las investigaciones del sitio.

Los detalles técnicos que nos interesan son:

– Capacidad (capacidad de combustión de residuos por hora). 150 kg / hora.

– Materiales de construcción, construcción de acero dulce de alta calidad de 5 mm; Revestimiento refractario de alta calidad de 100 mm.

– Acabado de pintura de alta temperatura

– Hasta 150 KG / Hrs.

– Consumo de energía y combustible.

– Olor a remoción de cenizas

– Cámara de proceso de curado automático con control de temperatura.

– Cámara secundaria

– Otros.

Posted on

a DUCK farm burner

a DUCK farm incinerator, we Need to purchase a tool size incinerator for organic waste, even more certain DUCKS.a pet crematorium in ireland.Equipment Dual chamber clinical infectious waste burner Ability 10-30 kg per hr Attributes of waste

home heating worth above 2000 kcal/kg (8370 kJ/kg); content of combustible matter over 60%; web content of non combustible solids below 5 percent; substance of non-combustible penalties listed below 20%; moisture content below 30% by weight

Combustion performance: The medica waste burner will be effective at reducing waste to ash not surpassing 10% of the overall flammable expenses.

Outside installment. All incinerator components will be acceptable for however not restricted to outside shaded setup, including electrical motors, be resistent to rust, wetness and related climate aspects.

Posted on

Capability of destruction in weight 60 Kg/h

clinical waste incinerator solutions as well as costs for 100 bed/ 500 bed/ 1000 bed/ 3000 bed healthcare facilities.
– – Assumption: general medical facility beds 50%, operation beds 50% for the 100 bed health center situation, while this

ratio is 30-70% for the other situations
–– global criteria and also waste productions assumptions ought to apply
INCINERATOR, DIESEL.

CAPABILITY: Burner 150 kg/hr.

Amount: 2 [2] with total accessories.

Sorts of wastes being utilized: GENERAL WASTE.Polyester, polypropylene, polystyrene, plastic acetate plastic, synthetic

plastics,
natural rubber, synthetic rubber, polyurethane sheet, and cumbersome films, solids and also
– – fragments that can be easily arranged
– – Things that easily deteriorate such as paper, timber, natural leather and garbage
– – Chemical waste solids and also liquids, waste oil and also various other difficult-to-handle items

The devices will certainly be licensed for operation from PME after passing site investigations.Manual tons double chamber

burner for clinical waste to melt 50kg/hr on constant procedure, with Main temperature level approximately

800degC minimum and 1200degC or even more in the Additional chamber, full with billing door, Ash door, Air as well as check out

ports, auxiliary air system with adjustable dampers, burners and burner control system and ignition unit, the whole to

meet NEMA requirements as well as various other global requirements. Здравствуйте! Меня интересует пе

чь для сжигания медицинских отходов инсинератор на 300 кг и 500 кг. Ж

ду ответа. Стоимость и доставка до г.Алматы Казахстан

The technical details we respect are:

–– Capability (burning capacity of waste per hr). 150kg/hour. Burner with 300l waste chamber

–– Build products, 5mm Excellent quality light steel construction; 100 mm excellent quality refractory lining.

–– High Temperature paint finish.we have 2 hospitals, more after that 20 dentist offices, and also over 50 physician workplaces.
would certainly it be feasible to give us information on the ability of burner we require

on this island.

–– Approximately 150 KG/Hrs. burner to dispose our day-to-day regular death for this size of the ranch.1. can the

100kg/hr melt solid waste/hazardous waste like expired paints, waste oil or chemicals.
2. What about the warm created during burning, are there windows or air circulation right into the containers.

–– Intake of power and also gas. medical facility garbage disposal system for a medical facility project

–– Ash removal odor.The burner is for CONTAMINATED MATERIALS and SOLID WASTE and also marginal carbon discharge.

–– Automatic treating process temperature regulated chamber.Incinerator with 150l waste chamber

–– Second chamber.

1. Do you have plans for above incinerators revealing flooring dimensions, height. BURNER FOR SMALL ANIMALS ABOUT 70-

100 KGR/PER TIME

2. What products should be utilized for the FLOOT, WALLS, ROOFING SYSTEM ETC. 1) The only consumable needed for the system TS100

(PLC) is Oil( diesel) is that OKAY?

2) from your technological requirements: oil intake (Kg/hour) is between 14–– 28) do you suggest is liters/hour?

example the incinerator will be operating for 10 hours daily indicates the oil usage will be ~ 140 Litres or even more?

3) Chimney type stainless steel. just how around main body building and construction materials?if there are a lot more two alternative of text

building and construction materials for better lifetime

3. Send out information concerning electrical power, ventilation, fire protection, wears down, chimney etc

4. Do you have erected shelters?Installation of waste disposal system (biomedical) 500kg capability design, MP 500

clinical incinerator.

5. We see you have container shelters. Send us value quote for this item

1. Capability of damage in weight: 60 Kg/h.
2. It must have the ability to operate not much less than 10 hours/day
3. This incinerator should have the ability to destruct all combustible wastes created by medical facilities, exclusive facilities,

laboratories, institutes, etc.
4. Layout Requirements: Types A, B, C, D, as well as E of clinical waste
5. ” PYROLYTIC” burning, by regulating the gasification of waste.
6. The incinerator has to stay clear of the launch of black smoke as well as fine dust, (Electric) throughout the loadings.
7. It must have the ability to reduce the volume of wastes by 98%.
8. It ought to be able to hold exhaust in the 2nd melt with gas house of not less than 2 seconds.
9. The incineration must be totally devoid of visible smoke in addition to offensive odours.
10. The reduced calorific power (L.C.P) of this waste will be 3,500 kcal/kg
– The Temperature levels of burning: Minimum will be 850oC as well as max 1400oC
– Message combustion: >> 1100oC.
11. The Inner diameter of the Smokeshaft: Ø 400 as well as its elevation: 8 m.
12. The Volume of the burning chamber: 1.200 L.
13. The Measurement of the door for packing in centimeters: 70×× 70.
14. Heater procedure should be Automatic On/Off.
15. Fuel: diesel.
16. The supplier has to give essential details for the very best of the installment.
This burner with “PYROLYTIC” burning should have:.
17. A burning chamber of waste:.
* Flawlessly tight door for the hand-operated loading of waste. The loading should be Guidebook, Set Tons.
* A heater of illumination which the usage is limited to the ignition of waste.
* Frontage of loading with door seals gone up on hinges, wheel of screw plug, flexible joint, as well as packing protecting

out of refractory.
* The insulation of the burning chamber ought to be made up of refractory bricks, having a high content of aluminium

and also insulates bricks in order to ensure a minimum temperature on the outdoors sheet metal.
* Make-up of the refractory;.
– Refractory concrete:
. Density: ≥ 100 mm
. Nature: 42% of Al203.
– Shield in fibrous panels:
. Thickness: ≥ 75 mm.
– Nature: Calcium silicate.
* Burner of lights of waste, with fuel, standard mono-bloc casting directing diving flame, lights and security of

digital ignition, irreversible air flow, electro-magnetic sluice gate of law as well as separating shutoff.
* Plate of combustion in Carborundum, staying clear of the dealing with of glass and slags.

18. A chamber of article burning of gases.
* A burner of burning of gases,.
* A tool of injection of air permitting an overall re-combustion of gases,.
* A gadget of air inlet of air conditioning of waste gases,.
* A sheath of discharge of the gases scorched.
* Carcass in strong sheet steel with support of link.
* Composition of the refractory;.
– Refractory concrete:.
Thickness: ≥ 150 mm.
Nature: 65% of Al203.
– Protect in fibrous panel:.
Thickness: ≥ 85 mm.
Nature: Calcium.
* Heater with gas, mono-bloc casting guiding type with horizontal flame, lighting as well as safety of digital

ignition, long-term air flow, electromagnetic sluice entrance of regulation and isolating valve.
* A secondary injection of air to guarantee excellent oxygen web content.
19. A control box making certain the total cycle of burning.

20. Follower:.
* Electro-ventilator distributing the secondary air, the policy of the air circulation being executed by valves and also

following the control of the automatic cycle.
21. Controls as well as policies:.
Control box watertight to dirt, consisting of:

* A switch breaker for every engine (ventilators and also burners).
* A timer with flexible temporization for the law of each burner.
* A regulator with digital watching for the temperature of burning.
* A regulatory authority with watch for the temperature of blog post combustion.
* Electric box.

21. The de- ashing needs to be carried out in all-time low of the burning chamber or the deashing should be Automatic or hands-on

set de ashing.
22. Process Filtering system: Scrubber to be stated as optional.
23. Discharge Specifications Conformity: BS 3316 or comparable requirement.
23. Ability to treat Plastic: Not much less than 40% by weight.
24. CE Manufacturing Conformity: BS EN 746-2-1997.
22. The provider has to give batches of spare parts of first urgency as well as consumable of the burner.
23. The mounted incinerator should birth a one year warranty.
24. The provider will perform an onsite installment of the incinerator.
25. The technological training of drivers will certainly have to be offered and also provided by a professional.
from the factory; it will consist of medicinal and also preventive upkeep, and using device, etc

Posted on

Leading Waste Incinerator

Basic Info.

Model NO.:construction of fire brick incinerator
Export Markets:Global

Product Description

Technology Respond(FAQ) 

Q: What is kind of waste can use in this equipment? 
A: This equipment for medical waste, pet animal, Municipal waste, live waste. Prohibit any explosive and radiation material, liquid waste and gas waste. 

Q: Incinerator Smoke Standard 
A: China Government Standard: No. GB18484-2001. 

Q: Treatment capacity 
A: Average Capacity calculated by medical waste(lower calorific power (L. C. P): 3.0TH Kcal/Kg per hour), not mean any waste material. China incinetor, china lab waste incinerators, china medical incinerator, china medical incinerators, china waste incinerator, clover incineter, clover medical ltd, The animal/pet combustion rate around 2/3 of average capacity. 

Clover incinerator use time per day up to 24 hours. Between each feed/combustion time, there are about 0.5-1 hours cooling time and time for feeding waste. Actual combustion time per day is around 16 hours. The lifetime of incinerator between 5-10 year according to use. 

Generally, we proposal small laboratory, small clinic use capacity under 20 kgs per hour. When incinerator use in hospital, please calculate the waste output capacity around 2kgs per people per day. If there are 200 sickbed in the hospital, that’s mean you need one incinerator capacity around 400kgs per day, change to capacity per hour is around 30-40 kgs per hour. According the operation time per day, waste material, budget, development, etc, you can use capacity from 30-50 kgs per hour incinerator. 
*How to calculate Animal Cremation Burn Rate: 2/3 of the medical waste. 

Q: Assembly and Testing 
A: We supply all documents and incinerators easy to installation and operation. Customer can send people come to our factory to learn installation and operation. Generally, We do not send engineer to local site if not request. The dispatch cost is extra according to order. 

Q: Combustion Temperature 
A: The first combustion chamber: 800-1000 centi degree. 
The second combustion chamber: 1000-1200 centi degree. 

Q: Incinerator Control Mode 
A: Default Control mode is common control case. PLC mode according to model and order. 

Q: Operation and maintenance costs 
A: Operation cost according to fuel consumption rate and power/staff, etc. 

Annual around $500-$1000USD per year maintenance according model, use situation. 

One person can service 02 unit incinerators. The staff should have basic electrician knowledge to operate/inspect/maintaince incinerator/burner/blower according to operation user guider, and know risk of medical waste to protect worker self with necessary protection element. 

Q: The Residency time in secondary combustion chamber 
A: 02 sec.

Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC)
Burn Rate 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour 100 kg/hour
Feed Capacity 20kg 40kg 60kg 100kg 200 kg
Control Mode PLC PLC PLC PLC PLC
Combustion Chamber 100L 210L 330L 560L 1200L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm 120x100x100cm
Secondary Chamber 50L 110L 180L 280L 600L
Smoke Filter Chamber Yes Yes Yes Yes Yes
Feed Mode Manual Manual Manual Manual Manual
Voltage 220V 220V 220V 220V 220V
Power 0.5Kw 0.5Kw 0.5Kw 0.7Kw 0.7Kw
Oil Consumption (kg/hour) 5.4–12.6 7.8–16.3 10.2–20 12.1–24 14–28
Gas Consumption (m3/hour) 6.2–11.4 8–15.7 9.8–20 9.9–26.1 10–32.2
Temperature Monitor Yes Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes Yes
Oil Tank 100L 100L 100L 100L 200L
Feed Door 30x30cm 45x40cm 55x50cm 70x55cm 80x60cm
Chimney 3Meter 3Meter 5Meter 5Meter 10Meter
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Gross Weight 1500kg 2200kg 3000kg 4500kg 6000kg
External Dimensions 140x90x120cm 160x110x130cm 175x120x140cm 230x130x155cm 260x150x180cm
Posted on

incinérateur domestique

Documents à soumettre comme suit;

  • Accréditations des fabricants
  • Rapport d’essai pour prouver le niveau d’émission nocif ZERO fourni sous forme d’échantillons provenant d’autres installations
  • Rapport d’essai pour prouver la stérilité obtenue au niveau 6log à 10 à fournir lors de la mise en service et de la validation.

La proposition technique comprend:

  • L’hôpital doit fournir l’espace nécessaire: bâtiment et infrastructure, alimentation électrique suffisante en vapeur et

raccordement à la conduite d’eau et d’égouts de la pièce vers la pièce

  • Préparation de la salle: la préparation, la rénovation et la modification de la salle sont à la charge du fournisseur
  • Le fournisseur doit soumettre le dessin nécessaire montrant les exigences d’espace (dimensions de la pièce (LxlxH)

processeurs et équipements auxiliaires

  • Le fournisseur doit donner la proposition de la puissance totale requise de l’ensemble de l’unité et sur laquelle l’hôpital

assurer l’alimentation électrique. Cependant, les connexions à l’intérieur de la pièce sont sous la responsabilité du fournisseur

  • Le raccordement / les raccords forment le processeur et les équipements auxiliaires à la conduite d’eau et d’égout sont fournis par les fournisseurs

responsabilité.

  • Une proposition de formation détaillée comprenant la durée de la formation du personnel sur la façon d’utiliser et de maintenir le processeur
  • Un calendrier d’entretien détaillé.
  • Liste des pièces de rechange et accessoires nécessaires à la maintenance du système

Garantie et services après-vente:

  • La période de garantie sera d’au moins 03 ans ou telle qu’offre le fabricant qui vient plus tard.
  • La période de garantie sera comptée à partir de la date de remise de la machine de la machine à l’utilisateur en fonctionnement

condition, c’est-à-dire date de la commission

  • Pendant la période de garantie, le fournisseur doit fournir tous les services d’entretien et de réparation.
  • Le temps de violation ne sera pas compté dans la période de garantie.
  • Un service de secours d’au moins 10 ans (y compris la période de garantie) doit être assuré par le fournisseur.
  • Les travaux de réparation / maintenance doivent être effectués dans les 72 heures suivant la demande de l’utilisateur.

Norme de qualité: le certificat CE / FDA de l’article proposé doit être soumis avec l’offre.

  • Pour la vérification du certificat, le soumissionnaire doit soumettre les éléments suivants:
  1. i) Adresse postale de l’émetteur du certificat.
  2. ii) Site Web, adresse e-mail et numéro de fax et de téléphone de l’émetteur.
  • La soumission ne sera pas recevable si:
  1. i) L’émetteur du certificat ne peut être joint
  2. ii) L’émetteur n’authentifie pas le certificat pendant la période de validité de l’offre

iii) L’émetteur confirme que le certificat soumis est défectueux en termes d’authenticité ou de validité.

Posted on

HIGH TECH PYROLYTIC MEDICAL WASTE BURNER

ADVANCED PYROLYTIC MEDICAL WASTE BURNER

1. Ability of damage in weight: 60 Kg/h.
2. It should have the ability to operate not much less than 10 hours/day
3. This burner needs to have the ability to demolish all flammable wastes produced by health centers,
private centers, research laboratories, institutes, etc…….
4. Design Spec: Types A, B, C, D, as well as E of clinical waste.
5. PYROLYTIC” burning, by regulating the gasification of waste.
6. The incinerator has to prevent the launch of black smoke as well as fine dust, (Smokeless) during the.
loadings.
7. It should be able to minimize the quantity of wastes by 98%.
8. It should be able to hold exhaust in the second burn with gas residence of not much less than 2 seconds.
9. The incineration should be entirely devoid of visible smoke in addition to offending odours.
10. The lower calorific power (L.C.P) of this waste will certainly be 3,500 kcal/kg.
– The Temperature levels of combustion: Minimum will be 850 ° C and also max 1400 ° C. – Message combustion: > > 1100 ° C.
11. The Inner diameter of the Chimney: Ø 400 as well as its elevation: 8 m.
12. The Quantity of the combustion chamber: 1.200 L.
13. The Measurement of the door for packing in cm: 70×× 70.
14. Heater procedure need to be Automatic On/Off.
15. Fuel: diesel.
16. The vendor has to provide necessary information for the very best of the installation This incinerator.
with “PYROLYTIC” combustion should have:.
17. A burning chamber of waste:.
* Perfectly tight door for the hand-operated loading of waste. The loading ought to be Guidebook, Set.
Tons.
* A heater of illumination which the usage is restricted to the ignition of waste.
* Frontage of filling with door seals increased on hinges, wheel of screw plug, adaptable joint, and also.
packing protecting out of refractor.-.
* The insulation of the combustion chamber must be made up of refractory bricks,.
having a high material of aluminium and shields blocks in order to ensure a minimum.
temperature outside sheet steel.
* Structure of the refractory;
– Refractory concrete:.
> > Thickness: > > 100 mm “.
> > Nature: 42% of A1203.
– Protect in fibrous panels:.
> > Thickness: > > 75 mm.
> > Nature: Calcium silicate.
* Heater of illumination of waste, with gas, conventional mono-bloc casting leading plunging.
flame, lighting and also safety and security of electronic ignition, permanent air flow, electro-magnetic sluice.
gateway of regulation and isolating valve.
* Plate of burning in Carborundum, preventing the dealing with of glass as well as slags.

18. A chamber of article burning of gases.
* A heater of burning of gases,.
* A gadget of shot of air permitting a total recombustion of gases,.
* A device of air inlet of air conditioning of waste gases,.
* A sheath of evacuation of the gases charred.
* Carcass in strong sheet steel with assistance of connection.
* Structure of the refractory;.
– Refractory concrete:.
> > Thickness: > > 150 mm.
>> Nature: 65% of A1203.
– Insulate in fibrous panel:.
>> Thickness: > > 85 mm.
>> Nature: Calcium.
* Heater with fuel, mono-bloc spreading guiding kind with straight fire, illumination and also safety of.
electronic ignition, long-term ventilation, electromagnetic sluice entrance of guideline and also separating.
valve.
* An additional shot of air to make sure excellent oxygen web content.

19. A control box making sure the complete cycle of combustion.

20. Fan:.
* Electro-ventilator dispersing the secondary air, the guideline of the air flow being.
carried out by valves as well as following the control of the automatic cycle.

21. Controls as well as guidelines:.
Control box watertight to dirt, including:.
* A button breaker for every engine (ventilators and heaters).
* A timer with adjustable temporization for the policy of each heater.
* A regulator with watch for the temperature level of combustion,.
* A regulatory authority with watch for the temperature of postcombustion.
* Electric box.

21. The de- ashing needs to be performed in all-time low of the burning chamber or the deashing.
ought to be Automatic or hand-operated set de ashing.

22. Refine Filtering system: Scruber to be mentionned as optional

23. Discharge Standards Compliance: BS 3316 or comparable conventional

23. Ability to treat Plastic: Not much less than 40% by weight

24. CE Production Conformity: BS EN 746-2-1997

22. The supplier should give sets of extra parts of very first necessity as well as consumable of the.
incinerator.

23. The installed burner has to birth a one year warranty.
24. The supplier will perforn an onsite installation of the burner.

25. The technical training of drivers will need to be provided and also provided by a professional from the.
manufacturing facility; it will certainly consist of medicinal as well as precautionary maintenance, and making use of equipment, etc

NB.; Civil works as well as any various other relevant solutions for the installment as well as training of drivers need to be included in the burner’s rate.

Requirements for the shelter of the burner:

House of the incinerator comprehensive in deal (your house must have toilet as well as hand washing centers and also firefighting). The dimension of the shelter shall measure 4 meter by six meter and shall be offered with appropriate air ventilation.

This material as well as equipment must include in the shed of the burner: foundation in debris rock, isolation roof covering versus humudity; elevation with block of 20 centimeters (bloc concrete), continuing lintel (linteau) in strengthened concrete; steel framework (charpente en metal); roof covering in sheet B.C.A. 28 BG

Posted on

Dual-chamber controlled air burner or Double – chamber pyrolytic burner

Types of incinerator design acceptable: Dual-chamber controlled air burner or dual – chamber pyrolytic incinerator

Products of building: The incinerator shall not have any type of asbestos, asbestos-containing compounds, mercury thermometers, and also mercury switches. Refractory materials shall be able to satisfy pertinent criteria under ISO TC33 in addition to CEN/TC 187. Waste feed system into the combustion chamber batch or continuous loading: For constant loading, the automatic charging ram or auger feed system will be capable of infusing small amounts of waste at regular intervals as well as ought to Be Able to Prevent waste from being fed when the burning chamber temperature is much less compared to 850 ° C. Additionally, the waste feed should just be able opened at or below 50 ° C in an ambient temperature level of 21 ° C.Primary combustion chamber: Shall be built with a housing (reinforced to withstand interior pressures without deflection or damage to the refractory or other elements) supported by a structural structure and supplied with refractory lining and insulation
Accessibility doors, openings, and also voids: All entry doors, openings, and also gaps shall be sealed to stop discharge of smoke in addition to exhaust gas and also to block entry of air throughout incinerator operations. Doors subjected to fire or direct warm of combustion gases shall be lined with the exact same kind and also depth of refractory mobile lining and insulation as that utilized in the burning chamber

Grate system for the primary chamber Relocating grate, traveling grate, reciprocating grate, or rotating drum grate

Main combustion chamber temperature level # 850 ° C without cool areas

Secondary combustion chamber: Shall be created with an exterior casing (strengthened to survive internal stress without deflection or damages to the refractory or various other elements ) as well as provided with refractory lining and insulation

Secondary burning chamber temperature level 1100 ° C or higher

Second burning chamber residence time # 2 minutes after the final shot of atmosphere in the second chamber