Posted on

little capability heaters


1    Basic Plant Design    An approved plant must have four distinct sections that demonstrate three principles of Turbulence, Residence Time and Temperature are inbuilt in the plant design .The regulated sections may include but not limited to:

Overall plant layout.
Feed chamber/ charging
Primary Combustion Chamber.
Secondary Combustion Chamber.
Particulate Scrubbers
Acid Gas Scrubbers
The stack/ chimney.
2    Feeding And Charging    Controlled hygienic, mechanical or automatic feeding methods have to be used which will not influence the air temperature in the primary and secondary chambers of the incinerator negatively.

No waste is to be fed into the incinerator:

1.    Until the minimum temperatures have been reached.
2.    If the minimum combustion temperatures are not maintained.
3.    Whenever the previous charge has not been completely combusted in the case of batch feeding.

4.    Until such time as the addition of more waste will not cause the design parameters of the incinerator to be exceeded.

3    Primary Combustion Chamber    The primary combustion chamber must:

1.    Be accepted as the primary combustion zone.
2.    Be equipped with a burner/s burning gas/fuel or low sulphur liquid fuels. Other combustion methods will be judged on merits.

3.    Ensure primary air supply is controlled efficiently
4.    Ensure minimum exit temperature is not less than 850oC

4    Secondary Combustion Chamber (Afterburner).    The secondary combustion chamber must:

1.    Be accepted as secondary combustion zone.
2.    Be fitted with secondary burner/s burning gas or low sulphur liquid fuel or any suitable fuel.

3.    Ensure secondary air supply is controlled efficiently.
4.    Ensure flame contact with all gases is achieved.
5.    Ensure residence time is not less than two (2) seconds.
6.    Ensure the gas temperature as measured against the inside wall in the secondary chamber & not in the flame zone, is not less than 1100oC.

7.    Ensure the oxygen content of the emitted gases is not less than 11%.
8.    Ensure both primary and the combustion temperatures are maintained until all waste has been completely combusted

5    Particulate Removers    A mechanical particulate collector must be incorporated after secondary combustion chamber for removal of particulate pollutants entrained in the flue gas stream. The particulate collectors may include any of the following or a combination thereof:

Cyclone separator
Electrostatic precipitators
Fabric filters
6    Chimney / Stack    1.    The chimney should have a minimum height of 10 meters above ground level and clear the highest point of the building by not less than 3 meters for all roofs. The topography and height of adjacent buildings within 50 meters radius should be taken into account.

2.    If possible the chimney should be visible to the operator from the feeding area.
3.    The addition of dilution air after combustion in order to achieve the requirement of these guidelines is unacceptable.

4.    The minimum exit velocity should be 10 m/s and at least twice the surrounding wind speed (Efflux velocity = wind speed x 2) whichever is higher to ensure no down washing of exiting gases.

5.    Point for the measurement of emissions shall be provided.

7    Instrumentation    Instrument for determining the inside wall temperature and not burner flame temperature must be provided for both primary and secondary chambers.

2.    An audible and visible alarm must be installed to warn the operator when the secondary temperature drops to below the required temperature.

3.    In addition to the above the following instruments may also be required.
A carbon monoxide and/or oxygen meter/recorder
A smoke density meter/recorder
A gas flow meter/recorder
A solid particulate meter/recorder
Any other instrument or measurement that may be considered necessary

8    Location / Siting    1.    Must be sited in accordance with the relevant local municipal authority planning scheme, the topography of the area and be compatible with premises in the neighborhood,

2.    Must be housed in a suitably ventilated room.

9    Emission Limits    1.    Combustion efficiency:

Combustion efficiency (CE) shall be at least 99.00%
The Combustion efficiency is computed as follows;

C.E=             % CO2           x 100
% CO2 + CO

2.    The temperature of the primary chamber shall be 800 ± 50o C

3.    The secondary chamber  gas residence time shall be at least 1 (one) second at 1050 ± 50o C, with 3% Oxygen in the stack gas.

4    Opacity of the smoke must not exceed 20% Viewed from 50 meters with naked eyes
5.    All the emission to the air other than steam or water vapour must be odourless and free from mist, fume and droplets.

6.    The Authority may require that the certificate holder have tests carried out by an accredited institution to determine stack and/or ground level concentrations of the following substances.

Cadmium and compounds as     Cd
Mercury                                      Hg
Thallium                                     Tl

Chromium                                  Cr
Beryllium                                    Be
Arsenic                                       As
Antimony                                    Sb
Barium                                        Ba
Lead                                            Pb
Silver                                          Ag
Cobalt                                         Co
Copper                                        Cu
Manganese                                  Mn
Tin                                               Sn
Vanadium                                     V
Nickel                                           Ni
Hydrochloric                                HCL
Hydrofluoric acid                         HF
Sulphur dioxide                           S02

7.    A 99.99% destruction and removal efficiency (DRE) for each principal organic hazardous constituent (POHC) in the waste feed where:

DRE = [(Win – Wout)/Win]*100
Where: Win = mass feed rate of the POHC in the waste stream fed to incinerator, and
Wout = mass emission rate of POHC in the stack prior to the release to the atmosphere.

8.    The average dioxin and furan concentration in the emissions should not exceed 80ng/m3 total dioxins and furans if measured for a period of 6 to 16 hours.

Note:
All pollutant concentrations must be expressed at Oo C and 1.013 x 10 5 N/m2, dry gas and 11% oxygen correction.

Oxygen correction is computed as:

Es =     21 – Os    x EM
21 – OM

Where:    Es    = Calculated emission concentration at the standard percentage oxygen concentration
EM    = Measured emission concentration
Os    = Standard oxygen concentration
OM    = measured oxygen concentration

10    Operation    1.    Materials destined for incineration should be of known origin and composition and must be only incinerated in a furnace that is registered for the particular type of waste.

2.    A record must be kept of the quantity, type and origin of the waste to be incinerated.
3.    The incinerator must be preheated to working temperature before charging any waste.
4.    The incinerator must not be overcharged.
5.    The incinerator must be in good working order at all times and must not be used if any component fails. Any malfunction should be recorded in a log book and reported to the relevant authority.

6.    The incinerator operator and all relevant staff must be trained to the satisfaction of the relevant control authority.

11    Housekeeping    The site where the incinerator is built must:

1.    Have running water.
2.    Have a solid floor.
3.     Have lighting if 24hrs operation
4.    Have fly ash containerization and storage before disposal.

12    Health & Safety (Protective Gear)    1.    Staff handling waste must be well trained on safe handling of hazardous wastes
2.     Staff must be provided with appropriate  protective gear such as, gas mask, aprons, gumboots, helmets, gloves, goggles.

3.     Caution and Warning signs must be provided.
4.     Fire fighting equipment must be provided
5.     There should be no smoking or eating on the site.


Posted on

pet incinerator deisel

and forced air exhaust stacks (or chimneys).

 

The charging system shall consist of, as a minimum, a hopper for top feeding and mechanically operated hydraulic

 

charging ram or augur. To prevent warpage or excessive thermal expansion, a charger cooling system using either

 

air or water shall be provided.

 

Primary combustion chamber shall be either the rotary- or stationary fixed-hearth (or kiln) type incinerator. Burner

 

and combustion air controls shall be fully automatic comprising of, as a minimum, electronic ignition and all

 

necessary interlocks and safety devices to provide safe operation. The chamber and burner shall be designed to

 

maintain a minimum combustion temperature of at least 700 to 870 C (1300 to 1600 F), but shall not to exceed 980

 

C (1800 F). The ash-removal system shall consist of the automatic continuous removal of the ash into an ashquench

 

pit where cooled by water and removed by conveyor.

Posted on

china medical burner


the complying with containerized burners. (Kitchen location as well as accommodations and grey water and black water plant eliminating waste) we need burner is each function various are done in one heater we require notified.
WASTE HEATERS SUGGESTIONS

china clinical burner Capability
? Disposal of both non-hazardous as well as infected products streams (per waste inventory).
?
Design/Specifications.
? Incinerators must have an added burning chamber with a minimum temperature selection of 900c.
? Liquid waste streams shall be blazed by a correct liquid shot system.
? The heaters will definitely be mounted with aesthetic alarm systems to indicate procedures of reduced temperature level in the secondary chamber.
Running Atmosphere as well as likewise Ambient Troubles

The Incinerators plan shall be developed to operate under the list below problems:.
? Ordinary Daily Max/Min June Temperature Level Level, 21-39 ° C.? Ordinary Daily Max/Min January Temperature Level Level, 2-12 ° C.
Medical waste heater,.
approx. 0.4 cubic metres,.
gas/ keys power operated,.
thermostatic temperature degree control,.
programmable cycle


Posted on

waste burner manufacturer china


waste burner manufacturer china, Waste chamber
Chamber capability 300 kg
Chamber quantity.54 m3.
Chamber dimension (exterior) Dimension: 91cm, Altitude: 86cm Size: 152cm.
Door opening 66 x 76 centimeters.
Elevation to door 84 centimeters.
Height to top of stack 5.4 m.
Suggested piece size (L x W x Density) 1.8 m x 2.4 m x 10 centimeters.
Lost cost: Regarding 45 kg/hr.
Pile:.
2′′ ′ ′ -14 ″ “dia.( 36 centimeters), 14 range( 1.90 mm) aluminized steel, refractory lined.
8′′ ′ ′ -12″″ ″ ″” dia. (30.5 centimeters), 16 range (1.52 ″″″.
” Burners Diesel.
Procedure Guidebook timer.
Electric remedy Demand – – – – 115 volt, 60 HZ, 20 amp.
General Description:.
Main Chamber: Sturdy steel covering.
Premium refractory cellular lining and also insulation.
Huge complete dimension leading bunches door along with fluid retention sill.
1 x diesel oil ended ignition heating units ran on/off.
Ash elimination door.
Chimney: Long lasting stainless steel housing.
1.5 m size.
0.6 m refractory lined pile.
Control Board: Control of 1 heater.
Timer control 0-12 hrs.
Crucial fan timer control.
Temperature surveillance.
Automatic Control.
Cycle time established.
Ancillaries: Operating and maintenance manuals.
Spares list.
Ash Rake.
Containerization: 20 foot delivery container with incinerator fitted.
500 litre gas tank


Posted on

pet waste incinerator manufacturer


Technical requirements for shedding gadget, animal waste incinerator supplier
1. 2 systems are required to be mounted in the south of the Kingdom of Saudi Arabia. Both systems will be utilized by tailored authority to melt various kind of medications. All need gadgets require to be given.
2. Warranty: booth systems need to be supplied 3 years service warranty from the day of approval. All called for extra components, preventative maintenance repair work as well as likewise corrective upkeep demand to be consisted of in the price as well as supplied to the client.
3. All needed electric in addition to water links need to be offered.
4. Both systems need to be of superior quality as well as must be ecological friendly.
5. The ability of each system need to be up to 100 kg/hr.
6. The system has to have actually automated feeding.
7. Each system needs to includes two melting areas, one primary area for melting the medication and additionally another room for melting the gases that release as an outcome of major burning.
8. The oven should be created from steel that is rust resistance and with density not less than 6 mm.
9. Each system needs to be of high trusted in shedding various kind of medicines, and also should certainly have 99.9% effectiveness for melting natural products.
10. Waste items need to not go beyond 5%.
11. System needs to have automated ignition system.
12. System requires to use diesel (HSD) as gas and should not consume greater than 8 to 10 lt/hr.
13. Each system ought to be given with fuel storage tank of measurement appropriate to run the system for one total day.
14. The temperature level in the primary area must be 850 C ± 50 C. the system require to additionally be qualified to operate as long as 1050 C ± 50 C. the system should can proceeds procedure in addition to needs to be supplied with concrete layer insulator with proper thickness.
15. Stove ought to be offered with cozy insulator to permit simple operation.
16. Gas should certainly stay in the additional location for not above 1.5 second.
17. The primary burning area have to contend the very least 2 heating systems.
18. The 2nd burning location require to have one heating system.
19. Each system must have doors for ash, leave for air to the smokeshaft and also windows to allow looking inside as well as for upkeep.
20. Each system must have filtering system for gas handling with 2 tanks utilizing average water. Each water container need to have capacity of 1000 lt and should certainly be repaired to the system in addition to provided with water degree sign.
21. Each system has to have unique technology for dividing waistline items and additionally humidity after gas handling.
22. Each system requires to have cooling off capability after treatment.
Each system m should be supplied with exhaust pipe with 250 mm size and also 10 m high. The base of the exhaust system ought to be 1000 mm. The exhaust system should be provided with stress indicator.
24. Electric power: require to be 220 volt, 3 phase, 60 Hz, as well as the electric motor needs to not be much less than 15 HP.
25. Each system has to be supplied control panel and also signs as well as required protection devices as well as alarm. The control panel ought to expose at the very least temperature degree in both the secret as well as added locations and additionally injectors of the filters as well as additionally tons.
26. Each system should certainly be provided with safety and security system for any break down or issue of any type of type of part of the system.
27. The following individual safety tools have to be offer:
a.Heat immune garments for 20 people.
b.Heat immune goggles for 20 persons.
28. All elements of each system should be painted with silver color that is warmth resistant.


Posted on

30 kg per hour-incinerator

Secondary combustion chamber shall be either the rotary- or stationary-hearth (or kiln) type incinerator designed to

 

oxidize (or burn) the organic vapors and gases. Burner and combustion air controls shall be fully automatic

Diesel incinerator of 25Kg / h

 

 

Box

Box dimensions of the incinerator.

 

Approx Width: 900 mm

Approx: 1000 mm

Approx height: 1000 mm

 

Dimensions of the chimney

 

Min height: 6000 mm

Diameter: 300 mm

 

Provided with two primary and secondary chambers.

Primary chamber volume: 0.25 m3

Secondary chamber volume: 0.25 m3

 

Made of steel with refractory lining

Door removal of grays

Display draws in both chambers

Temperature probes PTC type

 

Burners

Thermal Power Max: 5100 Kcal / h, 59 kW

Min 1700 Kcal / h, 20kw

 

Consumption approx. 2.6 to 5.0 kg / h

Voltage 230V-50Hz

Fan 75W, Rotation 2800 Rpm

Ignition transformer

Ignition means electrodes

Controller burner

Table controller

Thermometer digital camera primary and secondary

Regulating combustion head

Air regulation

Fuel: Diesel

Posted on

animal waste incinerator manufacturer

Technical specification for burning machine,animal waste incinerator manufacturer
1.Two systems are required to be installed in the south of the Kingdom of Saudi Arabia. The two systems will be used by custom authority to burn different kinds of drugs. All need equipment must be provided.
2.Warrantee:  booth systems must be provided with 3 years warrantee from the date of acceptance. All needed spare parts, preventative maintenance repair and corrective maintenance must be included in the cost and provided to the customer.
3.All needed electric and water connections must be provided.
4.Both systems must be of high quality and must be environmental friendly.
5.The capacity of each system should be up to 100 kg/hr.
6.The system must have automatic feeding.
7.Each system must consists of two burning  rooms, one primary room for burning the drug and another room for burning the gases  that emit as a result of primary burning.
8.The oven must be made of steel that is rust resistance and with thickness not less than 6 mm.
9.Each system must be of high efficient in burning different kinds of drugs, and should have 99.9% efficiency for burning organic materials.
10.Waste products should not exceed 5%.
11.System must have automatic ignition system.
12.System should use diesel (HSD) as fuel and should not consume more than  8 to 10 lt/hr .
13.Each system should be provided with fuel tank  of size adequate to operate the system for one full day.
14.The temperature in the primary room should be 850 C ± 50 C. the system should also be capable to operate up to 1050 C ± 50 C. the system should be capable of continues operation and should be provided with cement layer insulator with adequate thickness.
15.Oven should be provided with heat insulator to allow easy operation.
16.Gas should remain in the secondary room for not more than 1.5 second.
17.The primary burning room  should have at least 2 burners.
18.The secondary burning room should have one burner.
19.  Each system should have doors for ash, exit for air to the chimney and windows to allow looking inside and for maintenance.
20.Each system should have filtering system for gas processing with 2 tanks using ordinary water. Each water tank should have capacity of 1000 lt and should be fixed to the system and provided with water level indicator.
21.Each system should have special technology for separating waist products and humidity after gas processing.
22.Each system should have cooling capability after operation.
23.Each system m should be provided with exhaust pipe with 250 mm diameter and 10 m high. The base of the exhaust system should be 1000 mm. The exhaust pipe should be 6 mm and should be provide with heat insulator.  The exhaust system should be provided with pressure indicator. It should also provide with ladder and Lightning Arrestor.
24.Electric power: should be 220 volt, 3 phase, 60 Hz, and the motor should not be less than 15 HP.
25.Each system should be provided with control panel and indicators and needed safety equipment and alarm systems. The control panel should show at least temperature in both the primary and secondary rooms and injectors of the filters and load.
26.Each system should be provided with alarm system for any breakdown or defect of any component of the system.
27.The following personal protective tools must be provide:
a.Heat resistant garments for 20 persons.
b.Heat resistant goggles for 20 persons.
28.All components of each system should be painted with silver color that is heat resistant.

Posted on

scientific waste incinerator china


medical waste incinerator china, Design, supply and manufacture ex works of one Surefire Manual Load TS50/1 Medical/General waste incinerator as detailed below: –

·         Waste type: Mixed type o,1,2,3,&4 hospital/clinical bio hazard waste

·         Waste density: 125 to 350Kg/M3

·         Waste CV: 4000 KCAL/kg

·         Moisture content: 10-25%

·         Estimated ash residue: 5-10%

·         Nominal capacity: 30Kg/hour batch load

·         Secondary chamber: 0.5 second @ 850oC
·         Compact laboratory style

·         Two combustion chambers

·         Ecologically friendly

·         Up to 50kg of waste / hour

·         To be used for animals


Posted on

chinese burner providers


In a simple design with a metal steel drum electric. including:
A cage for receipt of biomedical waste;
A combustion chamber with fireplace with a filter to retain ashes;
A cover;
An air supply;
A turbine  allowing the supply of the air.
Combustion temperature: 1800 ° C. Compliance with European standards.
Comes with all necessary accessories
Supply of incinerator model PDR-18 with:

·        Capacity 100 kg/hr of waste containing up to 85% moisture

?      Two combustion chambers

·        Two fully automatic, oil fired, pressure jet burners

·        Panel board

·         Diesel tank of capacity 250 It. with 2 diesel pipelines, filter and valve.
Type: for animals waste
Capacity: 30 kg per hours for a maximum load of 120 kg.
GLP Gas
Voltage: 110V-120V
Semiautomatic control board
Stainless steel chimney, 3.5 meters above the incinerator.
High temperature painting for all the incinerator.
Front door for loading and unloading.
Fuel    Diesel Oil 8/ kerosene
Capacity (m3)    0.57
Ave Capacity    50 kg per hour
Ave time for Burnout     5 hrs
External Dimensions
Length    2000mm
Width    1100mm
Height including flue    3500mm
Door opening
Internal Dimensions
(primary chamber)
Length    1200mm
Width    620mm
Height     660mm
Operation
Min. operating temperature    9500C
Max. operating temperature    13200C
Residency time in second chamber    2.0 seconds
Weight    1850kgs
Ancillaries
Operating and maintenance manuals
Recommended Spare list
300 liter fuel tank
Plant burning rate – 100kg/hr

Fuel – Diesel oil   – 35 sec Redwood

Overall dimensions are as follows:

Width    2261mm

Length  3264mm

Chimney Diameter  –  390mm

Chimney Height      –  8000mm
chinese incinerator manufacturers, We process 8-10 ton waste of sheep carcass and its byproduct per day. We are looking for the equipment: combustion burners(combined fuel supply:natural gas and diesel),control panel and filter system. The diameter of the incinerator is 20 cm. Lower calorific power of the waste is 4KW/KG. Heating power 4000KW


Posted on

university hospital incinerator manufacturers


The Incinerator Plant is outcome wastes incineration from Different petrochemical devices. In this task we desire to blaze all result wastes from petrochemical gadgets and also additionally produced high stress steam from heater plant heat produced.
In the starting outcome waste from petrochemical collects as well as also moves to transit as well as additionally setting up center in various types. Input feeds of heater plant are gotten listed below table:

health center incinerator suppliers, Waste streams of petrochemical device gather and additionally keep en path and also Arranging Facility.
En Path as well as Planning Facility one lab demand to be taken into consideration.
In this center, waste will be identified in 2 groups:
–– – –– Improper for burning
– – Wastes that can be gone back to petrochemical.
Appropriate wastes are recognized right into both categories: –– – Input wastes to revolving kiln, consist of solids as well as likewise waste fluids.
–– – – Input wastes to fixed kiln, include clean fluids as well as likewise gasses.
All strong wastes should be moved to storage area pit from Transport along with Sorting. Solid wastes storage space pit is input of rotating kiln.
All liquid wastes require to be maintained and kept in Transit as well as Arranging. All storage space as well as stablizing tools or center have actually to be taken into factor to consider.
Storage and stablizing capacity requirement to be considered based on worst circumstances (shut down).
Normally burner plant contains 2 similar trains (capability of each train is 100%). Each train contains a rotary kiln as well as a dealt with kiln.