Posted on

Medical Incinerator

Basic Info.

Export Markets:Global

Additional Info.

Trademark:CLOVER

Product Description

Q: What’s kind of waste can use within this equipment?  A: This equipment to medical waste, pet animal, Municipal waste, reside waste. Prohibit any volatile and radiation substance, liquid gas and waste waste. 

Q: Incinerator Smoke Standard  A: China Government Standard: No. GB18484-2001. 

Q: Treatment capacity  A: Typical Capacity calculated by medical waste(lower calorific power (L. C. P): 3.0TH Kcal/Kg per hour)doesn’t indicate any waste material. The animal/pet combustion rate around 2/3 of average capacity. 

Clover incinerator use time per day up to 24 hours. Between every feed/combustion time, there are about 0.5-1 hours cooling time plus time to get feeding squander. Burning incenrator manufactuer, burning medical waste, burning waste chamber, purchase a portable crematorium, purchase a little incinerator, purchase creature cremation systems, Actual combustion time per day is about 16 hours. The life of incinerator involving 5-10 year according to use. 

Generally, we proposal little lab, little clinic use capability under 20 kgs per hour. When incinerator use in hospital, please compute the waste output around 2kgs per individuals every day. If there are 200 sickbed in the hospital, that’s imply you need 1 incinerator capability around 400kgs every day, change to capacity per hour is approximately 30-40 kgs per hour. According the operation time every day, waste material, funding, development, etc, you can use capacity from 30-50 kgs per hour incinerator.  *How to compute Animal Cremation Burn Rate: 2/3 of this medical waste. 

Q: Meeting and Testing  A: We supply all files and incinerators easy to setup and functionality. Client can send individuals visit our factory to find out operation and installation. Generally, We do not send engineer to neighborhood website if not request. The dispatch price is extra according to order. 

Q: Combustion Temperature  A: The first combustion chamber: 800-1000 centi degree. 

Q: Incinerator Control Mode  A: Default Control mode is common control instance. PLC mode according to model and order. 

Q: Operation and maintenance costs  A: Operation price according to fuel consumption rate and power/staff, etc. 

Annual approximately $500-$1000USD per year maintenance according model, use situation. 

One individual can service 02 unit incinerators. The staff should have basic electrician understanding to operate/inspect/maintaince incinerator/burner/blower according to operation user guider, and know threat of medical waste to protect worker self with essential protection element. 

Q: The Residency time in combustion chamber  A: 02 sec.

Items/Model YD-10C YD-20C YD-30C YD-50C
Burning Rate (kgs/Hour) 10 kgs/Hr. 20 kgs/Hr. 30 kgs/Hr. 50 kgs/Hr.
Feed Capacity (kgs) 40 kgs 40 kgs 50 kgs 80 kgs
Equipment Weight 1200 kgs 1200 kgs 1800 kgs 2200 kgs
Primary Chamber (Liters) 200 200 250 400
Secondary Chamber (Liters) 140 140 140 140
External Dimensions (cm) 170x140x160 170x140x160 170x140x190 180x160x200
Internal Dimensions (cm) 55x55x65 55x55x65 55x55x85 70x70x85
Oil Tank(Liters) 50 100 100 150
Door Opening (cm) 38 x 48 38 x 48 38 x 48 45×55
Chimney (M) 5 5 5 5
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Secondary Chamber  YES YES YES YES
Mix-Combustion Chamber YES YES YES YES
Smoke Filter Chamber YES YES YES YES
Combustion Fuel Oil/Gas Oil/Gas Oil/Gas Oil/Gas
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Temperature Monitoring YES YES YES YES
Posted on

Incinerator

Basic Info.

Model NO.:20 kg per hour
Pullution Sources:Solid Waste Processing
Processing Methods:Combustion
Export Markets:Global

Additional Info.

Trademark:clover

Product Description

Clover provide medical waste incinerators, animal and pet cremators, other solid waste incinerators to over 30 countries. We’ve re-designed the incinerators lining configuration. We also have installed and designed our own own PLC computer program into incinerator functioning system. Medical incinerastor installation costs, medical inciné Rateurs in china, medical incineration, medical incineration container, medical incineration in china, Clover know it is important that build them better, keep it simple and offer a great support. We make quality products which provide excellent payback on investment, our incinerators will be the most powerful and thermally efficient in the business.  The incinerator lines possess small scale to large scale, up to 500kgs per hour. The combustion chamber usage high strength material, expensive cost but better quality than rivals. Incinerator operation system use PLC program control mode, give the complicated manual operation.  Thank you to this help,

Items/Model TS20(PLC)
Burn Rate 20 kg/hour
Feed Capacity 40kg
Control Mode PLC
Combustion Chamber 210L
Internal Dimensions 65x65x50cm
Secondary Chamber 110L
Smoke Filter Chamber Yes
Feed Mode Manual
Voltage 220V
Power 0.5Kw
Oil Consumption (kg/hour) 7.8–16.3
Gas Consumption (m3/hour) 8–15.7
Temperature Monitor Yes
Temperature Protection Yes
Oil Tank 100L
Feed Door 45x40cm
Chimney 3Meter
Chimney Type Stainless Steel
1st. Chamber Temperature 800 centi-degree –1000  centi-degree
2nd. Chamber Temperature 1000 centi-degree -1200 centi-degree
Residency Time 2.0 Sec.
Gross Weight 2200kg
External Dimensions 160x110x130cm
 
Posted on

Incinerator USA Pharmaceutical

Basic Info.

Model NO.:incinerator supplier in saudi arabia
Export Markets:Global

Product Description

Key Attributes:  * All models with Dual combustion room.  * Stainless Steel chimney/stack, long lifetime. *according to order  * High temperature, long lifetime of incinerator.  * Free or minimal installation on site.  * High burn rate, from 10kgs to 500kgs per hour, cremation equipment for sale in china, cremation gear mill china, cremation furnace,  ” PLC Control Plane. *according to order  New Design for pet animal cremation business.  * One year guarantee on incinerator and parts in stock.  Program Scope:  1. Hospital& practice: Iatric Waste, Infectious Waste, Dressing, Bio-Waste, Medicine.  2. Slaughter House &Pet Hospital &Farm: Dead Animal, Bio-Waste.  3. Community & Sea Port & Station: Cremation in china, cremation incinerator, cremation incinerator layout up to 6ton per day. Municipal Solid Waste, etc.  4. Laboratories, Remote Locations, Disaster Relief Operations, Animal Cremation

Items/Model YD-30 YD-50 YD-100 YD-150
Burning Rate (kgs/Hour) 30 kgs/Hr. 50 kgs/Hr. 100 kgs/Hr. 150 kgs/Hr.
Feed Capacity (kgs) 60 kgs 150 kgs 200 kgs 300 kgs
Equipment Weight 2300 kgs 4000 kgs 4300 kgs 7000 kgs
Primary Chamber (Liters) 360 900 1200 1500
Secondary Chamber (Liters) 200 200 500 500
External Dimensions (cm) 145x90x175 200x160x230 220x180x360 240x170x380
Internal Dimensions (cm) 100x60x60 120x90x85 130x100x90 150x100x96
Oil Tank(Liters) 200 300 300 500
Door Opening (cm) 48 x 60 62 x 80 55 x 80 59 x 81
Chimney (M) 5 5 10 10
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Secondary Chamber  YES YES YES YES
Mix-Combustion Chamber YES YES YES YES
Smoke Filter Chamber YES YES YES YES
Combustion Fuel Oil/Gas Oil/Gas Oil/Gas Oil/Gas
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Temperature Monitoring YES YES YES YES
Posted on

Medical Incinerator

Basic Info.

Export Markets:Global

Additional Info.

Trademark:CLOVER

Product Description

Q: What is kind of waste can utilize within this gear?  A: This gear to medical waste, pet animal, Municipal waste, reside waste. Prohibit any volatile and radiation substance, liquid gas and waste waste. 

Q: Incinerator Smoke Standard  A: China Government Standard: No. GB18484-2001. 

Q: Remedy capacity  A: Typical Capacity calculated by medical waste(lower calorific power (L. C. P): 3.0TH Kcal/Kg per hour)doesn’t mean any waste material. The animal/pet combustion rate around 2/3 of average capacity. 

Clover incinerator utilize time per day up to 24 hours. Between every feed/combustion time, you will find about 0.5-1 hours cooling time and time for feeding waste. Burning incenrator manufactuer, burning medical waste, burning waste chamber, purchase a mobile crematorium, purchase a small incinerator, purchase animal cremation systems, Actual combustion time per day is about 16 hours. The lifetime of incinerator involving 5-10 year based on utilize. 

Generally, we proposal small lab, small clinic use capacity under 20 kgs per hour. If incinerator use in hospital, please calculate the waste output capacity around 2kgs per people per day. If there are 200 sickbed at the clinic, that’s mean you need 1 incinerator capacity around 400kgs per day, change to capacity per hour is approximately 30-40 kgs per hour. According the operation period per day, waste material, budget, development, etc, you can use capacity from 30-50 kgs per hour incinerator.  *How to calculate Animal Cremation Burn Rate: 2/3 of the medical waste. 

Q: Meeting and Testing  A: We supply all documents and incinerators easy to setup and functionality. Customer can send people visit our factory to find out installation and operation. Generally, we don’t send engineer to local site or even ask. The dispatch price is additional based on order.  The next combustion chamber: 1000-1200 centi degree.  PLC mode based on model and order. 

Q: Operation and maintenance costs  A: Operation price based on fuel consumption rate and power/staff, etc. 

Annual approximately $500-$1000USD annually maintenance according model, utilize situation. 

One person can service 02 unit incinerators. The staff must have basic electrician knowledge to operate/inspect/maintaince incinerator/burner/blower based on performance user guider, and understand risk of medical waste to safeguard worker self with essential protection component. 

One person can service 02 unit incinerators. The staff should have basic electrician knowledge to operate/inspect/maintaince incinerator/burner/blower according to operation user guider, and know risk of medical waste to protect worker self with necessary protection element. 

Q: The Residency time in secondary combustion chamber 
A: 02 sec.

Items/Model YD-10C YD-20C YD-30C YD-50C
Burning Rate (kgs/Hour) 10 kgs/Hr. 20 kgs/Hr. 30 kgs/Hr. 50 kgs/Hr.
Feed Capacity (kgs) 40 kgs 40 kgs 50 kgs 80 kgs
Equipment Weight 1200 kgs 1200 kgs 1800 kgs 2200 kgs
Primary Chamber (Liters) 200 200 250 400
Secondary Chamber (Liters) 140 140 140 140
External Dimensions (cm) 170x140x160 170x140x160 170x140x190 180x160x200
Internal Dimensions (cm) 55x55x65 55x55x65 55x55x85 70x70x85
Oil Tank(Liters) 50 100 100 150
Door Opening (cm) 38 x 48 38 x 48 38 x 48 45×55
Chimney (M) 5 5 5 5
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Secondary Chamber  YES YES YES YES
Mix-Combustion Chamber YES YES YES YES
Smoke Filter Chamber YES YES YES YES
Combustion Fuel Oil/Gas Oil/Gas Oil/Gas Oil/Gas
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Temperature Monitoring YES YES YES YES
Posted on

Incinerator PLC

Basic Info.

Pullution Sources:Solid Waste Processing
Processing Methods:Combustion
Export Markets:Global

Additional Info.

Trademark:clover

Product Description

Incinerator is a incineration equipment, direct fire waste by gas fuel or oi fuel. As distinct circumscription, incinerator can be termed many words as below: 

Therapy ability: Small scale incinerator, large scale incinerator and incineration pant. 

Waste material: Municipal waste incinerator, medical waste incinerator, animal cremation incinerator, individual cremators 

Incinerator fuel: Gas incinerator, oil incinerator 

Waste to Energy (WTE): WTE incinerator, non-WTE incinerator 

Incinerator Manufacturer: China incinerator manufacturer, UK incinerator manufacturer, USA incinerator manufacturer, India incinerator manufacturer. 

Famous Incinerator manufacturer company: Inciner8(UK), Clover Incinerator(China), Pennram (USA), Haat (India) 

Burning Rate: 5kgs/hour, 10 kgs/hour, 15 kgs/hour, 20 kgs/hour, 30 kgs/hour, 50 kgs/hour, 100 kgs/hour, 150 kgs/hour, 300 kgs/hour, 500 kgs/hour 

PLC( Programmable Logic Controller), Intelligent and automated operation. Set combuston time based on different waste material and incinerator medical waste incinerators italy, medical waste incinerators manufacturer, medical waste incinerators manufacturers in china, medical waste incinerators makers in usa, stop combustion . Set temperature protection parameter, if the temperature overheat, incinerator cease combustion .

Items Specification
Model TS10(PLC) / TS20(PLC) / TS30(PLC) / TS50(PLC) / TS100(PLC)
Main Product List Double Combustion Chamber
Smoke Filter Chamber
PLC Mode Control Case
Stainless Steel Chimney
Italy oil/gas burner: 02 units
Oil Tank (if oil fuel)
Posted on

Oil Waste Incinerator

Basic Info.

Export Markets:Global

Product Description

Key Attributes:  * All versions with Dual combustion chamber.  * Stainless Steel chimney/stack, long life. *according to order  * High temperature, long life of incinerator.  * Free or minimum installation onsite.  * High speed, from 10kgs to 500kgs per hour, up to 6ton per day.  * PLC Control Plane. *according to order  * New Design for pet animal cremation enterprise.  * One year guarantee on incinerator and components in stock.  Program Scope:  1. Hospital& practice: Iatric Waste, Infectious Waste, Dressing, Bio-Waste, Medicine.  2. Slaughter House &Pet Hospital &Farm: Dead Animal, Bio-Waste.  3. Is a leading waste incinerator maker in China. We are local manufacturer and one of the greatest exporter of China. Pyrolytic incinerator gear technical is main waste treatment each one the world, such as Medical Waste, diesel energy w2e, diesel fire incinerator thermax, diesel fired hospital waste incinerator, diesel fired incinerator, diesel fired medical waste incinreator, Animal Incineration, Pet cremation and other Solid wste. The capacity from 10kgs/Hr. To 500kgs/Hr. , up to 6ton per day. Presentlywe supply different series for local client requirements and layout upgraded incinerator with our leading technology. The upgraded design characteristic of our range of incinerators make them one of the most cost effective in the world.

Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC)
Burn Rate 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour 100 kg/hour
Feed Capacity 20kg 40kg 60kg 100kg 200 kg
Control Mode PLC PLC PLC PLC PLC
Combustion Chamber 100L 210L 330L 560L 1200L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm 120x100x100cm
Secondary Chamber 50L 110L 180L 280L 600L
Smoke Filter Chamber Yes Yes Yes Yes Yes
Feed Mode Manual Manual Manual Manual Manual
Voltage 220V 220V 220V 220V 220V
Power 0.5Kw 0.5Kw 0.5Kw 0.7Kw 0.7Kw
Oil Consumption (kg/hour) 5.4–12.6 7.8–16.3 10.2–20 12.1–24 14–28
Gas Consumption (m3/hour) 6.2–11.4 8–15.7 9.8–20 9.9–26.1 10–32.2
Temperature Monitor Yes Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes Yes
Oil Tank 100L 100L 100L 100L 200L
Feed Door 30x30cm 45x40cm 55x50cm 70x55cm 80x60cm
Chimney 3Meter 3Meter 5Meter 5Meter 10Meter
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Gross Weight 1500kg 2200kg 3000kg 4500kg 6000kg
External Dimensions 140x90x120cm 160x110x130cm 175x120x140cm 230x130x155cm 260x150x180cm
Posted on

Hospital Incinerator

Basic Info.

Export Markets:Global

Additional Info.

Trademark:clover

Product Description

Items Specification
Model TS10(PLC) / TS20(PLC) / TS30(PLC) / TS50(PLC) / TS100(PLC)
Main Product List Double Combustion Chamber
Smoke Filter Chamber
PLC Mode Control Case
Stainless Steel Chimney
Italy oil/gas burner: 02 units
Oil Tank (if oil fuel)
Posted on

Incinerator Equipment

Basic Info.

Pullution Sources:Solid Waste Processing
Processing Methods:Combustion
Export Markets:Global

Additional Info.

Trademark:Nanjing Clover

Product Description

TS version PLC incinerator is latest layout for waste treatment, include health care waste, animal cremation and other solid waste. This equipment quality structural for types of website, like medical waste maker, medical waste pyrolys, medical waste sterilization”300kg”, medical waste providers china, medical waste treatment china, hospital, environmental division, animal cremation agencies, etc.. CLOVER Incinerator supply updated models with dual combustion chamber and smoke filter chamber with refractory lines, and the combustion chamber temperature up to 1200 deg C.

Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC)
Burn Rate 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour 100 kg/hour
Feed Capacity 20kg 40kg 60kg 100kg 200 kg
Control Mode PLC PLC PLC PLC PLC
Combustion Chamber 100L 210L 330L 560L 1200L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm 120x100x100cm
Secondary Chamber 50L 110L 180L 280L 600L
Smoke Filter Chamber Yes Yes Yes Yes Yes
Feed Mode Manual Manual Manual Manual Manual
Voltage 220V 220V 220V 220V 220V
Power 0.5Kw 0.5Kw 0.5Kw 0.7Kw 0.7Kw
Oil Consumption (kg/hour) 5.4–12.6 7.8–16.3 10.2–20 12.1–24 14–28
Gas Consumption (m3/hour) 6.2–11.4 8–15.7 9.8–20 9.9–26.1 10–32.2
Temperature Monitor Yes Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes Yes
Oil Tank 100L 100L 100L 100L 200L
Feed Door 30x30cm 45x40cm 55x50cm 70x55cm 80x60cm
Chimney 3Meter 3Meter 5Meter 5Meter 10Meter
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel Stainless Steel
1st. Chamber Temperature 800–1000 degree 800–1000 degree 800–1000 degree 800–1000 degree 800–1000 degree
2nd. Chamber Temperature 1000-1200 degree 1000-1200 degree 1000-1200 degree 1000-1200 degree 1000-1200 degree
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Gross Weight 1500kg 2200kg 3000kg 4500kg 6000kg
External Dimensions 140x90x120cm 160x110x130cm 175x120x140cm 230x130x155cm 260x150x180cm
Posted on

Efficient stove technology Alleviates N. Kenya’s Health waste Issue

WAMBA, Kenya, June 30 (Thomson Reuters Foundation) – Poor weather, safety threats and bad roads are made disposing of the Wamba district hospital’s health waste a challenge.

The closest incinerator is roughly 200 kilometres (125 miles) away and “travelling was not possible during heavy rains since linking roads were cut away from floods,” said Stephen Lesrumat, a medic at the hospital.

But today the north-central Kenyan hospital has an answer to its problems, and also a way of cutting climate changing emissions and deforestation: A high-efficiency medical waste incinerator which uses just a fifth time the fuel of a conventional incinerator.

The wood burner, that takes advantage of powerful winds from the area to drive the flames, borrows technology from fuel-efficient stoves. It can safely eliminate waste made by the Wamba hospital and from 22 other health centres in Samburu County, said Lesrumat and Ibrahim Lokomoi, the centre ’s engineer.

“It’s decreased the burden of travelling away from the county to eliminate medical waste,” Lesrumat said, sparing hospitals a possibly dangerous build-up of medical waste during periods when roads are impassible.

During previous flood periods, when hospital waste couldn’t be transported, “I had been worried since the waste is toxic,” Lesrumat explained. “It could cause environment and health damage if it inadvertently spilled into the community. ”

Run-ins with al Shabaab militants can also be a hazard for some healthcare workers in Kenya driving long distances in their jobs, medics said.

“Northern Kenya is quite expansive and has so many challenges which the government struggles to deliver services,” said Onyango Okoth the assistant commissioner of Samburu County.

Now the Wamba incinerator manages between 5 and 20 kilograms of medical waste every day.

Since the burner operates, a young worker clad in protective clothing flips open the lid of the room to monitor the practice of incineration.

Seeing the previous batch of waste is all but removed, he reaches for a cone containing a variety of used rubber gloves, syringes and polythene waste, pours in a number of the waste, mixes it with a forked rod then replaces the lid to permit the incineration to continue.

SOLAR INCINERATION?

The next step, Kenyan clean energy experts say, may be to begin incinerating waste using even more sustainable sources of electricity, such as solar power.

“Kenya is investing heavily in alternative energy sources,” said Johnson Kimani of the Kenya Climate Change Working Group. “Solar and biogas should be factored into medical waste incineration in the event the government is committed to the assurance of achieving a green market. ”

James Lebasha, of the International Medical Corps, that helped assemble the Wamba incinerator, said the burner might be just the first for the area.

“We aspire to build more units in morthern Kenya to allow communities access this support,” he explained. (Reporting from Kagondu Njagi; editing by Laurie Goering:Please charge the Thomson Reuters Foundation, the charitable arm of Thomson Reuters, that covers humanitarian news, climate modification, women’s rights, trafficking and corruption.

“We hope to build more units in morthern Kenya to enable communities access this service,” he said. (Reporting by Kagondu Njagi; editing by Laurie Goering :; Please credit the Thomson Reuters Foundation, the charitable arm of Thomson Reuters, that covers humanitarian news, climate change, women’s rights, trafficking and corruption. Visit www.trust.org/climate)

from: http://www.reuters.com/article/2015/06/30/kenya-medical-energy-idUSL8N0ZG1M220150630

Posted on

Two Chamber Medical Waste Incinerator

Basic Info.

Model NO.:tempreture of the stoker moving grate incinerator
Export Markets:Global

Product Description

Key Features:  * All models with Dual combustion chamber.  * Stainless Steel chimney/stack, long life. *based on sequence * High fever, long life of incinerator.  * Free or minimal installation on site.  * High speed, from 10kgs to 500kgs per hour, up to 6ton per day.  *based on order  New Design for pet animal cremation enterprise.  * One year warranty on incinerator and components in stock. 

Key Features:  * All models with Dual combustion chamber.  * Stainless Steel chimney/stack, long life. *based on sequence * High fever, long life of incinerator.  * Free or minimal installation on site.  * High burn , from 10kgs into 500kgs large medical incinerators, large scale medical waste incinerator, bio medical incenarator manufacturer in china, life threatening medical waste incinerators manufacturers china, per hour, up to 6ton per day.  *based on order  New Design for pet animal cremation enterprise.  * One year warranty on incinerator and components in stock. 

Program Scope:  1. Hospital& practice: Iatric Waste, Infectious Waste, Dressing, Bio-Waste, Medicine.  2. 3. Community & Sea Port & Station: Municipal Solid Waste, etc.  4. Laboratories, Remote Locations, Disaster Relief Operations, Animal Cremation

Items/Model YD-30 YD-50 YD-100 YD-150
Burning Rate (kgs/Hour) 30 kgs/Hr. 50 kgs/Hr. 100 kgs/Hr. 150 kgs/Hr.
Feed Capacity (kgs) 60 kgs 150 kgs 200 kgs 300 kgs
Equipment Weight 2300 kgs 4000 kgs 4300 kgs 7000 kgs
Primary Chamber (Liters) 360 900 1200 1500
Secondary Chamber (Liters) 200 200 500 500
External Dimensions (cm) 145x90x175 200x160x230 220x180x360 240x170x380
Internal Dimensions (cm) 100x60x60 120x90x85 130x100x90 150x100x96
Oil Tank(Liters) 200 300 300 500
Door Opening (cm) 48 x 60 62 x 80 55 x 80 59 x 81
Chimney (M) 5 5 10 10
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Secondary Chamber  YES YES YES YES
Mix-Combustion Chamber YES YES YES YES
Smoke Filter Chamber YES YES YES YES
Combustion Fuel Oil/Gas Oil/Gas Oil/Gas Oil/Gas
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Temperature Monitoring YES YES YES YES