INCINERATOR TESTING AND ALSO COMMISSIONING

The container will be mounted using a 25mm reduction in the direction of the water drain-off tapping stage. The distribution outlet shall be expanded within the container to prevent access of water in the supply line. The major contractor will assemble container assistances and bund wall surfaces to information drawings created by the sub-contractor. A valued drain off from the most affordable part of the tank shall be supplied total with tail pipeline in addition to a stipulation for hose pipe connection.

E-5

1.1.8 TRANSFER HAND PUMP

A semi rotary hand pump will be provided filling the afternoon storage tank from the oil drum. It’ll be set up complete with all the needed pipes fittings and accessories.

1.1.9 DAILY SERVICE CONTAINER

A day-to-day tank of small ability 1,800 Litres will be placed at 2.5 metre high degree in the burner room. Storage tank shall be made from 6mm thick pushed steel plates of 1220mm x 1220mm black mild steel sheet, complete with bolted cover and also ample venting. The storage tank will satisfy BS 799 part 5 1995 as well as be provided with a substances view tube. The tank shall be lagged with 50mm thick fibre glass insulation of 0.4 W/m2 thermal conductivity and also finished with 20SWG galvanized sheets cladding.

The container will be examined for any type of escapes of which if any sort of is identified will certainly be made good prior to the tank is painted on the surface with rust hindering paint. Tank to be safely bolted. Joints shall be screwed, and also adequate unions should be given to allow simple taking down the equipment.

A 25mm size fire shutoff of the fast action lever ran dead weight type is going to be mounted, in the oil flow line. This will be held at the employment opportunity by a moderate scale steel wire connected to a fusible link. The fusible link will be placed directly over the burner. The cozy heater oil feed from the high degree day container will be heated by an electrical mapping tape effectively wrapped around the pipe. The pipeline will then be shielded with 25mm thick fiber glass insulation in addition to finished with gauge 22swg galvanized steel sheet.

The distribution pipeline from the mass oil storage tank to the high degree day has actually been set up by others however the tenderer shall allow connection to the high level day container. The tenderer will also provide and also set up high capacity filters along the supply pipe and the burner feed pipeline.

1.1.11 PIPE SUPPORTS

The range and type of assistances will be kept to a minimum and also their design will be such as to market overview in addition to safe coping to match concrete masonry or timber.

Consideration will be provided when designing assistances to the maintenance of desirable pipe reduction in addition to the restraining of pipe motions to a longitudinal axial directions only.

The sub-contractor shall provide and set up all steel work creating a part of pipeline assistance assemblies and also will be responsible for making good any type of damages to contractors work associated with contractors function installation.

Pipe runs will be secured by clips linked to pipe hangers, wall braces or trapeze type sustains. ‘U’ screws will not be used for clips with no previous approval of the Engineer.

The sub-contractor will submit his entire proposition for the pipeline supports to the Engineer for authorization prior to any type of erection work commences.

1.1.12 ELECTRICAL WORKS

All of circuitry in between items, plant in addition to controls shall be implemented by the tenderer. The tenderer shall provide adequate supervision to make sure that electrical connections are properly made to all products of devices in addition to controls supplied by him, all to the Job Manager’s/ Designer’s contentment.

E-6

1.1.13 INCINERATOR SCREENING in addition to COMMISSIONING

The tenderer will check and also commission the incinerator in the presence of the Engineer.The tenderer will also offer enough oil to last a minimum of two (2) hours. The tenderer shall test and commission the incinerator in the existence of the Designer and also verify that the incinerator is functioning according to the specifications laid here-in and in the catalogues in addition to manuals from the sellers of he incinerator.The burner performance test will be carried out in conformity to BS3316: part 4:1987. Ought to any type of problem be spotted, it will be remedied and the screening process duplicated to the Task Manager’s satisfaction.

1.1.14 FIRE DIRECTION NOTIFICATION

Proceed and procure and also mount as below;

Print fire direction on the Perspex plate, 3mm close White Colour.
( v) 50mm diameter supply pipeline
– Day of test.
( vi) 25mm diameter water drain-off worth

The tenderer will provide hydrostatic oil substances gauge (degree indication) or a.
– Test stress.
Oil ignition system
( ii) The design head over the top of the tank that’s 3.5 m of water.

The pressure shall be raised slowly in addition to steadily up until the specified test pressure is reached which pressure is going to be preserved for a duration enough time to allow a comprehensive exam to be made to make certain that the tank is sound enough and reveals no leaks or excessive distortion. Bonded joints will be radiographed in addition to a certificate provided. Should any defects be found, they will be made good in addition to the examination treatment replicated till the storage tank is certified to be sound. The examinations shall be implemented in the visibility of the Engineer and in the end, the sub-contractor will provide the Designer with the exam certification.

The storage tank shall then be cleansed on the surface and given with rust inhibiting guide prior to using 2No. Layers of bituminous paint. The within will likewise be cleansed and purged of any type of foreign matter before setting to work.

Ladders in addition to platforms shall be completely cleaned up as well as devoid of rust and range in addition to painted using a priming coat of accepted paint.

The tank shall be supplied with the following:-

(I) 450mm bolted evaluation covers with fluid and vapour tight joint created with a gasket of gasoline immune materials.
Correctly adjusted stick (of dip tape) and gain access to ladder to the peak of the storage tank.

The loading pipeline shall be expanded within the container to within 150mm of storage tank foundation,.
Centre line near the outlet link.

– Gross capability in litres.
Photo-electric cells

2 sets of upkeep and operating handbooks (both for the incinerator in addition to burners) have to similarly be provided. This include two sets of controller schematic representations for all the controls and wiring.

1.1.7 MASS OIL TANK

The bulk oil storage tank nominal capacity of 10,200 litres and also complying with BS 799 part 5: 1975 shall be placed on three concrete cradles.

The functions will include supply, distribution, assembling, erection, testing, commissioning and readying to operate. The container is to be of bonded light steel type using a design stress of 40KN/m2 in addition to storage temperature of 240 C. It is to be situated beside the incinerator and boiler residence.

The container shall be around with dished end and be created of 6mm thick block moderate steel plates according to BS 1966. Top high quality galvanized materials will not be used.Welded construction parts shall be sprayed.

E-4

The tank will be pressure tested with a general head of water or matching, gauged from the bottom of the tank, and also equal to 1 1/2 times the sum of

(I) The elevation of the container and also
– Manufacturer’s name of profession mark.
( iv) 50mm size checking link with lockable cap.
( ii) 75mm (3″) vent socket screwed B-SP in addition to pipeline at the higher end of the storage tank with an unloading device to prevent the rise in storage tank pressure over the style stress. The air vent pipeline shall be devoid of springs as well as will have a continuous surge while being as short as hassle-free. It will terminate in open air in a position where it can not be damaged. The open end is going to be rejected and fitted with an open mesh wire cage.

A flue chimney, 15,000 mm lengthy and 560mm diameter will be assembled from steel sheet, complete with lagging, damper and also rain water protection cone. The chimney will be lined with castable grade diatomaceous concrete mixed with high alumina cement according to BS 4076: 1989.

The damper will certainly regulate the closing of the door to not less than 85%. The pile is to enable fresh air at the supply’s foundation so the flue gases are discharged at not move after that 4000 C that the discharge conforms to the British Clean Air Act, the National Setting Administration Agency (NEMA) Act or other pertinent acts.

1.1.4 POWER SUPPLY

The sub-contractor will provide equipment that are acceptable for operating on a 415V, 3 phase, 50HZ or 240V, solitary stage, 50HZ electrical power distribution.

1.1.5 OIL STORAGE AND ALSO SUPPLY

The system will contain a bulk oil tank, day-to-day storage tank, move hand fuel pump and also linked pipe job. Oil from the mass tank will be offered to a high level daily tank situated in the burner area using a transfer hand pump in addition to automated electric pump. Part from the burner spares pointed out right here under, the spares prices should not be included in the main recap of prices routine yet is to be separate and are indicated to be arranged later if and also when it ends up being required as well as suitable to the client. The heater saves whose prices are to be consisted of in the main summary of costs timetable (BQ) are:-

I) 1No. Establish of safety controls
Complete with anti-siphoning device.

The following information shall be completely and also plainly marked on the tank around the.
– Optimum allowed working pressure.
Solenoid valve
– Year of manufacture.

The tenderer will check and also commission the incinerator in the presence of the Engineer.The tenderer will also offer enough oil to last a minimum of 2 (2) hours. The tenderer shall test and commission the incinerator in the presence of the Designer and also verify that the incinerator is functioning according to the specifications laid here-in and in the catalogues as well as manuals from the vendors of he incinerator.The burner performance test will be carried out in conformity to BS3316: part 4:1987. Ought to any type of problem be spotted, it will be remedied and the screening procedure duplicated to the Task Manager’s satisfaction.

1.1.14 FIRE DIRECTION NOTIFICATION

Proceed and procure and also mount as below;

Print fire direction on the Perspex plate, 3mm close White Colour.
History measuring 510mm lengthx380mm size as adheres to;

Posted on

Municipal Waste Incinerator

Basic Info.

Export Markets:Global

Product Description

Key Features: 
* All models with Dual combustion chamber. 
* Stainless Steel chimney/stack, long lifetime. *according to order 
* High temperature, long lifetime of incinerator. 
* Free or minimum installation on site. 
* High burn rate, from 10kgs to 500kgs per hour, up to 6ton per day. 
* PLC Control Plane. *according to order 
* New Design for pet animal cremation business. 
* One year warranty on incinerator and parts in stock. 
Application Scope: 
1. Hospital& clinic: Iatric Waste, Infectious Waste, Dressing, Bio-Waste, Medicine. 
2. Slaughter House &Pet Hospital &Farm: Dead Animal, Bio-Waste. 
3. Community & Sea Port & Station: Municipal Solid Waste, etc. 
4. Laboratories, Remote Locations, Disaster Relief Operations, Animal Cremation 

Nanjing Clover Medical Technology Co., Ltd. is a leading waste incinerator manufacturer in China. We are local manufacturer and one of the largest exporter of China. Pyrolytic incinerator equipment technical is main waste treatment all of the world, for Medical Waste, Animal Incineration, incinerator 100kg per batch. Pdf, incinerator. Net, incinerator/portable waste incinerator, incinerators 30 kgs capacity, incinerators for hospitals from China, Pet cremation and other Solid wste. The capacity from 10kgs/Hr. To 500kgs/Hr., up to 6ton per day. Presently, we supply different series for local customer requirements and design updated incinerator with our leading technology. The updated design feature of our range of incinerators make them one of the most cost effective in the world.

Items/Model YD-200 YD-300 YD-500 YD-600
Burning Rate (kgs/Hour) 200 kgs/Hr. 300 kgs/Hr. 500 kgs/Hr. 600 kgs/Hr.
Feed Capacity (kgs) 400 kgs 500 kgs 800 kgs 1100 kgs
Equipment Weight 7600 kgs 8300 kgs 13000 kgs 16500 kgs
Primary Chamber (Liters) 2000 2400 4000 5500
Secondary Chamber (Liters) 500 1200 1500 1500
External Dimensions (cm) 270 x 185 x 380 260x220x420 320x220x460 360 x 220 x 475
Internal Dimensions (cm) 180 x 115 x 96 220x110x100 257x147x108 300 x 147 x 125
Oil Tank(Liters) 300 500 500 500
Door Opening (cm) 59 x 81 90 x 110 108 x 128 108 x 128
Chimney (M) 10 10 14 14
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Secondary Chamber  YES YES YES YES
Mix-Combustion Chamber YES YES YES YES
Smoke Filter Chamber YES YES YES YES
Combustion Fuel Oil/Gas Oil/Gas Oil/Gas Oil/Gas
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Temperature Monitoring YES YES YES YES

Posted on

Animal body components , other biomedical waste , body organs dung

51.No    Features    $_pecific tions
1    (Incinerator)
Type of waste for disposal    Animal  body  parts,other  biomedical  waste,organs dung, bedding materials,plant p缸ts and food itemsι
Incinerators for conversion of waste to fine,white sterile
ash with no visible smoke or odour
2.    Load capacity    300 – 4∞Kg (maximum)
3.    Bum capacity    100 Kgjhr (minimum)
4    Fuel    Diesel (LDOjHSD)
5.    Type of Bumer operation    Automatic diesel fired
6.    Primary chamber    Solid hearth
Dense refractory concrete lining
Operating temeeralure of 850 土 50 deg C or more
7.    Secondary chamber    Slid heath
Dense refractory concrete lining
Opera恤19 temperature of 1∞o deg C or more
8.    Temperature control    Digital temperature control and display
Temperature monitoring and thermostatic control
9.    Power supply    220V for control Box
10    Size    Compact design preferred
11.    Opening lid    Large top open归g lid (Approx . 700 mm x 500mm) for
easy loading
12.    Fuel tank    100-150 L

13.    Civil    works,    installation    and
comnuss!Onmg    lndusive  of  civil  works  (brick  wall  incinerator  house
with a shutter door,CGI sheet roofing) according to 由e
model of the incinerator.
lnstallation and commissioning of the incinerators including hiring of heavy machineries requ让ed at the time of instalIation .
Electric power supply line to light incinerator house as well as to control box of the incinerator
Onsite  demonstrationjperformance  test  and  adequate training of staff on the use of incinerators.
Warranty of one year from the date of commissioning. Separate   Annual    Maintenance    Contract   would    be drawn with the supplier at a later stage.
14.    Catalogue    Catalogue containing detail pictures and spec迁ications
of  the  quoted  incinerator  must  be  included  in  the
bidding document

Posted on

Говоря о проблемах упаковки воздушных фильтров с завесными завесами, воздушных душей, чистых навесов и другого очистного оборудования

16 мая 2019 г. Новости отрасли 204 просмотра

Очистку оборудования продукты , производимые нашей компанией, в том числе воздушных душей, передаточных окон, верстаки, извилистые фильтры и т.д., все большие по размеру, начиная от 1-2 квадратных метров, а намотка воздушные фильтры 5-6 квадратных метров. Каждый партия доставляется целыми частями и отправляется по всей стране, особенно фильтры с рольставнями отправляются на относительно удаленные очистные сооружения в центральных и западных регионах, а установки для очистки отработанных газов в основном упаковываются в деревянные ящики, подходящие для большие расстояния Транспортировка и может адаптироваться к требованиям изменения климата, влагостойкость, влагостойкость, ударопрочность, защита от ржавчины и устойчивость к грубому обращению. За любые убытки, вызванные плохой упаковкой, или любые повреждения ржавчиной, вызванные несоответствующими или неправильными мерами защиты , наша компания несет все расходы и убытки, связанные с этим.

Наши клиенты часто признаются, что поддоны и картонные коробки воздушных душей, передаточных окон или другого очистного оборудования других производителей не повреждены, когда их принимают, но когда они открываются для установки, они обнаруживают, что некоторые детали слегка деформированы или капля краски Это явление влияет на внешний вид всего оборудования.Если вы непосредственно устанавливаете и беспокоитесь об установке, вы беспокоитесь о внешнем виде продукта. Владелец отказывается принять осмотр, возврат или ремонт прошли период старения рекламации по качеству, и поставщик не может обеспечить логистику Компания утверждает.

Процесс упаковки очистительного оборудования Nanjing Yixiou :

1. Когда оборудование изготовлено и готово к загрузке, сначала очистите внутренние и внешние ящики, чтобы предотвратить прилипание других загрязняющих веществ и пыли к поверхности продукта.

2. Во-вторых, оберните углы и углы ящика крафт-бумагой , которую легко тереть, которая подходит для дальних грузов, чтобы уменьшить столкновения.

3. Все обернуто стрейч пленкой слой за слоем , что может эффективно уменьшить дождливые дни перевозки , избежать проникновения воды и предотвратить попадание пыли и жидкостей.

4. Закрепите очистное оборудование в деревянном ящике, а ключевые детали закрепите ограничительными деревянными планками, чтобы предотвратить перемещение товаров при транспортировке на дальние расстояния.

5. Используйте утолщенные пластиково-стальные уплотнительные ремни для фиксации корпуса коробки и нижнего лотка, чтобы предотвратить столкновение и опрокидывание во время транспортировки.

5. Воздушная душевая подходит для обычных транспортных средств, ее нельзя ставить боком, не допускать ударов или столкновений во время транспортировки, и лучше всего держать ее ровной.

6. После того, как воздушный поток прибудет в пункт назначения, как можно скорее откройте коробку для осмотра, чтобы убедиться, что компоненты не повреждены из-за транспортировки. Если повреждение обнаружено, вы должны сообщить об этом логистической компании или водителю-доставщику и указать соответствующий информация о накладной.

7. Упакованную воздушную душевую следует хранить в хорошо вентилируемом складе с относительной влажностью не более 85%, в окружающем воздухе не должно быть кислотных, щелочных и других агрессивных газов.

Хотя упаковка и транспортировка воздушного душа – сложный процесс, если вы выберете компанию обычного воздушного душа, вы сможете обеспечить безопасность воздушного душа, спирального воздушного фильтра и другого оборудования.

URL с дополнительным содержанием: www.ecolead.cn Тел: 025-57138032

Posted on

Installation of waste non reusable burner system

Setup of waste non reusable system in airport.Incinerator with oil burner

–– The design should prevent any sort of launch of contaminating substances into dirt, surface area water and groundwater.

–– Burning area should get to a minimum of 860 degrees under the most damaging conditions with at least 6% oxygen. Since it will treat organic and harmful waste, temperature level has to reach at least 1100 degrees for at least 2 2nd.

–– Flue gases must be cooled down to 200 levels or reduced prior to flue gas therapy. The flue gas cleaning equipment maust go into the very least two-field electrostatic precipitator/ESPdust
Incineration Temparature: 800 Degree or over.
Native soil: ITALY. – Diesel burner.

–– 25Kg/h. It will certainly have generally paper, cardboard and also food, but it will surely incinerate medical waste. So the burner will have the ability to deal with organic and contaminated materials.

–– Spare components for a single year.Burning Capacity: 400kg/ Human Resources (Optimum Combustion time is 6 times/ Day).
Emission:.
Voltage: 220V.
Fan Power: need to not surpass 1.1 kw.

NO2- Should Not exceed 500mg/m3.
SO2- Should not surpass 400mg/m3.
CO- Don’t surpass 100mg/m3.
Feeding Door Size: less than 1000x1300mm.

–– It must be geared up with filter to minimize as well as include toxins from natural and clinical waste.

–– Easy to operate for virtually inexperienced employees.

Posted on

Chauffage YD-100 pour l'Irak

Il y a 03 ensembles Design YD-100 en circulation en Irak entre 2013 et 2014. Le chauffage utilisé pour le voisinage d’un certain nombre de structures ainsi que de chantiers de construction en plus de tous les types de gaz est le diesel.

Articles / modèle YD-100
Taux de combustion (kg / heure) 100 kg / heure
Capacité d’alimentation (kg) 200 kilogrammes
Poids de l’équipement 5300 kilogrammes
Chambre primaire (litres) 1200
Chambre secondaire (litres) 500
Dimensions extérieures (cm) 220 x 180 x 360
Dimensions internes (cm) 130 x 100 x 90
Réservoir d’huile (litres) 300
Ouverture de porte (cm) 55 x 80
Cheminée (M) dix
Type de cheminée Acier inoxydable
Chambre secondaire OUI
Chambre de mélange-combustion OUI
Chambre de filtre à fumée OUI
Combustible de combustion Gaz de pétrole
Temps de résidence 2,0 sec.
Surveillance de la température OUI
1er. Température Chmaber 800 –1000
2ème. Température Chmaber 1000 -1200
Environnement médical  

Incinérateurs de déchets
Incinérateur de déchets médicaux
Crémation d’animaux de compagnie
Déchets solides   Incinérateur

Tél: + 86-25-8461 0201
Mobile: + 86-13813931455 (whatsapp / wechat)
Site Web: www.hiclover.com
E-mail: [email protected]
E-mail: [email protected]
Nanjing Clover Medical Technology Co., Ltd.
Posted on

Incinerator capable of dealing with in between 300 & & 500 kgs fitted with the wet scrubber system

Automatic filling and refilling with capability of 10 to 12 bunches per day working with gas therapy techniques and gas fuel and also ought to comply with the European Standards.the Federal Government Healthcare Facility for Medical Waste Incinerator with the adhering to Specifications. they are having basic wastes like cells, plastic bottles etc, wastes originating from work camps, to be incinerated, they require, 50kg/hr incinerator
MEDICAL WASTE INCINERATOR.our healthcare facility produce 40 kg daily from all waste product
–– Capability: 1000 kg/h
–– Kind waste: industrial waste
–– Other demands: Automatic waste filling system and exhaust therapy system.
1. Capacity: 100kgs per batch
2. Temperature
I. Primary Chamber 600- 800
ii. Secondary chamber 850- 1500
3. Consumption per batch: 3.2 humans resources.
4. Gas consumption: 7 litres per set. Incinerator with the ability of treating in between 300 & & 500 kgs fitted with the wet scrubber system.complete Burner with an ability of 500kgs/ hr with a wet scrubber device. a 10-20Kg per hour of residential waste? Likewise, I would like to understand what is the minimum ability burner you have in instance we need something smaller?a Waste Incinerator of 500 Metric Tonne per day burning capability as I am in ownership of a huge quantity of mixed/municipal waste (4/5 million tonnes) of the following make-up (52% natural, 12% plastic, 16% paper, 6% metal, 4% glass and also 10% other). The EU codes of the waste are as complies with: 20 03 01, 19 12 10 and 19 12 12.
Among the vital making a decision aspects of the prospective distributor is the energy usage of the strategy, showed either per hr or daily and also I would certainly appreciate if such information can be made available.

Posted on

Medical Waste Incinerator

Basic Info.

Model NO.:medical waste incinerators china
Export Markets:Global

Product Description

A Model animal crematory burning rate from 20-400kgs a hour. Heavy duty combustion room and match for big animal cremation.  Residency time 2.0 sec. In place combustion chamber. Virtually smoke and smell free. 

Smoke Filter Chamber with filter brick, Virtually smoke and smell free after burningoff.

Italy original oil or gas burner, quality reliable. It suit for petrol oil, natural gas, LPG gas. 

User guider, full setup and operation document for customer.

Items/Model A1500 A2400 A4000 A5500
Burning Rate *animal 90 kgs/Hr. 150 kgs/Hr. 200 kgs/Hr. 400 kgs/Hr.
Feed Capacity *animal 120 kgs 200 kgs 300 kgs 500 kgs
Equipment Weight 7000 kgs 8300 kgs 13000 kgs 16500 kgs
Picture  
Primary Chamber (Liters) 1500 2400 4000 5500
Secondary Chamber (Liters) 500 1200 1500 1500
External Dimensions (cm) 240x170x380 260x220x420 320x220x460 360 x 220 x 475
Internal Dimensions (cm) 150x100x96 220x110x100 257x147x108 300 x 147 x 125
Oil Tank(Liters) 500 500 500 500
Door Opening (cm) 59 x 81 90 x 110 108 x 128 108 x 128
Chimney (M) 10 10 14 14
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Secondary Chamber  YES YES YES YES
Mix-Combustion Chamber YES YES YES YES
Smoke Filter Chamber YES YES YES YES
Combustion Fuel Oil/Gas Oil/Gas Oil/Gas Oil/Gas
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Temperature Monitoring YES YES YES YES
Posted on

Мусоросжигательная установка для больничных отходов

описание продукта

Компания Nanjing Clover Medical Technology Co., Ltd. является ведущим производителем мусоросжигательных установок в Китае. Мы – местный производитель и один из крупнейших экспортеров Китая. Техническое оборудование пиролитических инсинераторов – это основная обработка отходов во всем мире, включая медицинские отходы, сжигание животных, кремацию домашних животных и другие твердые отходы. Емкость от 10кг / час. До 500 кг / час, до 6 тонн в день. В настоящее время мы поставляем различные серии в соответствии с требованиями местных клиентов и проектируем обновленную мусоросжигательную печь с использованием наших передовых технологий. Обновленные конструктивные особенности нашего ассортимента мусоросжигательных печей делают их одними из самых экономичных в мире.

Инсинератор с ПЛК модели TS – это новейшая разработка для обработки отходов, включая медицинские отходы, кремацию животных и другие твердые отходы. Это качественное оборудование для различных объектов, таких как больница, небольшие поставщики мусоросжигательных установок, небольшие установки для сжигания отходовc, небольшие установки для сжигания отходов, небольшие установки для сжигания медицинских отходов, сделанные нами, небольшие установки для сжигания медицинских отходов, отдел охраны окружающей среды, агентства по кремации животных и т. Д. Поставка мусоросжигательных установок CLOVER обновленные модели с двойной камерой сгорания и камерой дымового фильтра с огнеупорными линиями, а также температурой камеры сгорания до 1200 ° C.

Предметы / Модель TS50 (ПЛК)
Картина
Скорость сжигания 50 кг / час
Емкость подачи 100кг
Режим управления ПЛК
Камера сгорания 560 л
Внутренние размеры 100x80x70 см
Вторичная камера 280L
Камера дымового фильтра да
Режим подачи Руководство по эксплуатации
Напряжение 220В
Мощность 0,7 кВт
Расход масла (кг / час) 12.1–24
Расход газа (м3 / час) 9,9–26,1
Монитор температуры да
Температурная защита да
Масляный бак 100л
Дверца подачи 70×55см
Камин 5 метров
Тип дымохода Нержавеющая сталь
1-й. Температура камеры 800 градусов – 1000 градусов
2-й. Температура камеры 1000 градусов-1200 градусов
Время проживания 2.0 сек.
Вес брутто 4500кг
Внешние размеры 230x130x155 см
Posted on

Dead Pet Cremation Equipment

Product Description

Nanjing Clover Medical Technology Co., Ltd. Is a leading waste incinerator manufacturer in China. We are local manufacturer and one of the largest exporter of China. Pyrolytic incinerator equipment technical is main waste treatment all of the world, for Medical waste, Pet animal cremation and other Solid waste. The capacity from 10kgs/Hr. To 500kgs/Hr., up to 6ton per day. Presently, we supply different series for bunker capacity, incinerator. Au, incinerator(smokeles), incinerator+hospital, incinerator+manufacturer, incinerator modelsyc10 2b, local customer requirements and design updated incinerator with our leading technology. The updated design feature of our range of incinerators make them one of the most cost effective in the world. 

Key Features: 
* All models with Dual combustion chamber. 
* Stainless Steel chimney/stack, long lifetime. *according to order 
* High temperature, long lifetime of incinerator. 
* Free or minimum installation on site. 
* High burn rate, from 10kgs to 500kgs per hour, up to 6ton per day. 
* PLC Control Plane. *according to order 
* New Design for pet animal cremation business. 
* One year warranty on incinerator and parts in stock.

Items Specification
YDC Model YD-10C / YD-20C / YD-30C / YD-50C
Main Product List Primary Combustion Chamber
Secondary Combustion Chamber
Mix Combustion Chamber
Smoke Filter Chamber
Incinerator Common Control Case
Stainless Steel Chimney
Italy oil/gas burner: 02 units
Oil Tank (if oil fuel)